Loading
Loading…
Loading…
188 results • Latest
BALANCE WORK-SUPPLY, INSTALLATION ,TESTING AND COMMISSIONING OF FIRE FIGHTING & FIRE ALARM SYSTEM INCLUSIVE CONSTRUCTION WORK OF UNDER GROUND TANK, OVER HEAD TANK & PUMP ROOM WITH SHED AT DISTRICT HOSPITAL KANKER, DISTRICT – KANKER (C.G.)
REPAIR WORK AT PUSHER CAR RAIL TRACK AND CHARGING CAR IB 2 AND IB 3 AREAS IN COKE OVEN COMPLEX OF NSL PLANT
Diesel Generator Set as per MHA QRs (Q2) (3 (3 ))
UHMWPE LINER 1500X1000X10MM- 67± 5(SHORE, UHMWPE LINER 3000X1500X20MM- 67± 5(SHORE
Supply of Caustic Soda Lye (48% concentration)
CONTROL VALVE ACTUATOR ASSEMBLY-1600675245, REPAIR KIT OF CONTROL VALVE-1600675246, TRIM SET OF CONTROL VALVE-1600675247