Loading…
Loading…
1,615 results • Latest
Construction of a CC footpath along the Kaptanganj Road, extending from the Bhatharinha Jot intersection to Phulwariya Kohar.
Silage
As per Tender Document
As per Tender Document
Overhauling of DG set installed at 220KV Sub-station Gidahi Basti and 132KV Sub-station Nathnagar Under ETD-I, Basti.
Construction of Medha Manjhari manikaurakhurd to purwa Shivmandir Tak Road
REPLACEMENT OF OLD 120 KV LA OF 132 KV KHALILABAD-DULHIPAR LINE BAY AND 132 KV KHALILABADNATHNAGAR LINE BAY AT 132KV S/S KHALILABAD UNDER ETD-I, BASTI.
90 mm and 160 mm pipeline extension work 2850 meters
Medical X - Ray Films (Q2) (3 (3 ))
construction of composite school at basti
Renewal of Bhanpur Tenuwa Ashanahara to Nanukdeeh Road
Renewal of Ramnagar Mehaura Chauraghat Ka Approach Road
Renewal of Sonupar Rampur Devariya Km. 11 to Moodadiha Sikara Road
CONSTRUCTION OF BHOYAR CHAUBEY LINK ROAD TO DUBHRA CHAUBEY HOTE HUE CHAUDHARIPURWA ROAD
AR OF BHOLAPUR TO BHALUKONI ROAD
AR OF SAUPURA SAHDULLANAGAR GAURA CHAUKI PAR KUWANO NADI PAR SETU KE PAHUCH MARG
Shahpur Dhobha to Katya Mustahkam Road
Ramvapur Jagatram to Betnar Abadi via Keshavjot link road
Badaliya Sohna Road
VIKAS KHAND GAUR KE ANTRAGAT VIBHINA GRAMIN MARGO KE PAT HOLS FILING AND PAKKE PATCH MARRAMAT KA KARYA
VIKAS KHAND KAPTANGANJ KE ANTRAGAT VIBHINA GRAMIN MARGO KE PAT HOLS FILING AND PAKKE PATCH MARRAMAT KA KARYA
VIDHAN SABHA KAPTANGANJ KE ANTRAGAT VIBHINA ODR MARGO KE PAT HOLS FILING AND PAKKE PATCH MARRAMAT KA KARYA
CONSTRUCTION OF GRAM SABHA KAUDIKOL SWARG ASHRAM MANDIR TO PIKAURABHARI GRAM TAK ROAD
From Naudih Biskohar to Phulpur Raja Bhulahiya Canal track km 2 to Ram Nagar link road
Farenda Naugarh Barhni Shravasti (NHW-1A) on Madhni to Dhekhari-Sansari-Dhebrua road
Renewal of Koyalra Baizpur Kalla Bhatta road
Renewal of Chirakutiya Baraijot Pranpur hote huye Puraina link road
Construction of an interlocking CC road and drainage system in Ward No. 06, Vindhyavasini Nagar, extending from the existing interlocking road through the Nishad settlement up to the bridge
Construction of a CC road on the route leading from Ramnayans house to Geeta Aryas house in Ward No. 02.
Construction of an interlocking road and drainage system in Ward No. 08, Mohalla Turkahia, extending from Bablus house to Kallans house, up to the area in front of Gonars house, and continuing to the Kanchan Tola public toilet.
Construction of an interlocking road and drainage system in Ward No. 08, Turkahia, extending from the main road near the open drain through the Harijan settlement up to the Turkahia culvert.
Construction of an interlocking CC road on the route leading from Rajdevs house to Suryabhans house in Ward No. 13.
Construction of a CC interlocking road and drainage system in Ward No. 06, Ramjanaki Nagar, on the route extending from Chetra Harijan Tola Ramkishores house through the Marvatiya boundary up to Ram Kumars house.
Construction of a CC road and drainage system in Ward No. 06, Chaipurwa, extending from Kanhaiya Srivastavas house to Radhes house.
Construction of a CC road and drainage system in Ward No. 06, extending from Kashi Nishads house to Ram Sanjeevans house.
Construction of a CC road and drainage system in Ward No. 13, Mahrikhawan, extending from Ramnaths house to Sanjay Pandeys house.
Construction of a CC road and drainage system in Ward No. 17, Damrua, extending from Anil Rajbhars house passing through Ravindra Gautams house up to Indira Public School.
Construction of interlocking roads and drains in the connecting lanes extending from Raju Guptas house to the residence of the late Gabbu Lal Sonkar. Ward No. 01, Narharia
Ward No. 14, Gadgoriya Construction of CC Concrete roads and drains in the connecting lanes within the Scheduled Caste settlement extending from in front of Vinods house, passing through Monu Garage, to in front of Mithai Lals house.
Ward No. 04, Shastri Nagar, Lalganj Construction of link roads and drains in various lanes of the ward specifically from Deeh Sthan to the houses of Kanhaiya and Bhagelu from Pradeeps house, passing through the houses of Chandra Mauli and Shashikant,
Ward No. 09, Atal Nagar Construction of link roads and drains in various lanes of the ward specifically from Dr. Madrasis house to Mantoos house and from Pandey Niwas, passing through Vishwas Sharmas house, up to Ramesh Pandeys house
Ward No. 04, Shastri Nagar Construction of CC roads, crossings, side walls, and drains in the area adjacent to Sohan and others, extending up to the vicinity of Ghisiyawan and others residences.
Ward No. 13, Shyama Prasad Mukherjee Nagar Construction of CC roads and drains extending from Sahadev Gaurs house, passing through Sukhus house, up to the Industrial Center.
Ward No. 09, Atal Nagar Construction of CC roads and drains extending from Shivkumars house, passing through Sampurnanand Chakravartis house, to the area beyond Mayaram Babas shrine.
Ward No. 01, Ambedkar Nagar Construction of CC roads and drains extending from Aap Pathaks house to Deepu Yadavs house.
Construction of interlocking paving and drains including drain covers extending from in front of Chunnu Munnus house, passing through Poonam Guptas house and Salmans house, up to Habibullah Ansaris house.
Construction of a CC Concrete road, including covered drains, extending from Bhawani Bheekhs house to the Masters house
Construction of an interlocking road, including covered drains, extending from Mohit Pandeys house passing through Jagannath Tiwaris land and the Mangala Mahakali Temple up to Vijay Srivastavas house
Construction of a CC road in the Dalit settlement of Ward No. 03 Patelnagar within Adarsh Nagar Panchayat Kaptanganj, extending from Dharm Prakashs house passing through the houses of Surendra Bahadur and Baburam up to the Maharajganj Salvahanpur
Construction of a CC road in the Dalit settlement of Ward No. 03 Patelnagar within Adarsh Nagar Panchayat Kaptanganj, extending from Laljis house to the houses of Rammagan and Ramsagar.