Loading…
Loading…
1,615 results • Latest
Construction of a CC road in Ward No. 13, Shyama Prasad Mukherjee Nagar, extending from the main road to Mohanti Dubey house.
Construction of a CC road and drainage system (including covers) in Ward No. 07, Vashishth Nagar (Harankha), extending from Santosh house to Gattu house
Construction of a CC road in Ward No. 02, Sant Ravidas Nagar, extending from Sumere Sonkar plot to the culvert situated in front of Bhadai Sonkar house
Installation of barricades and wire mesh fencing at the newly constructed Gaushala (Cowshed)
Construction of a CC road and drainage system (including covers) in Ward No. 01, Ambedkar Nagar (Rajghat), extending from Asaram house to Jang Bahadur house
Construction of a CC (Concrete) road Iin Ward No. 10, Bhagat Singh Nagar, extending from Ghulam Ali house to Satyarama Maurya house.
In Ward No. 06 (Bhawani Prasad Nagar) Construction of a CC road extending from Shyamlal house to Baburam house
In Ward No. 05 (Lohia Nagar, Devapar) Upgradation of two wells, including the installation of protective iron grilles
In Ward No. 10 (Bhagat Singh Nagar) Construction of a CC road and installation of Hume pipes, extending from Jang Bahadur Mishra house passing through Mithilesh Mishra house up to Om Prakash Mishra house.
In Ward No. 13 (Shyama Prasad Mukherji Nagar) Construction of a CC road extending from the Tema Main road, passing through Sajjanlal house, up to the Kali Mata shrine.
In Ward No. 12 (Rani Lakshmi Bai Nagar) Construction of a CC road extending from Indrajit house to Shivkumar house.
In Ward No. 11 (Guruprasad Nagar) Construction of a drain slab in front of Vijay Jaiswal house
Construction 10 Nos. Dampners Between Km. 13.220 to 13.500 on Vikramjot-Dhushwa Bund and Between Km. 0.000 to 0.230 on Kashipur-Dubauliya Bund for Protection of Embankments on Left Bank of River Ghaghara (Saryu) in Distt.-Basti.
Placeing of Purcupine Between Km. 4.700 to 5.250 for Protection of Kashipur-Dubauliya Ebankment on Left Bank of River Ghaghara (Saryu) in Distt.- Basti.
Construction of Revetment Between Km. 9.300 to Km. 9.510 of Vikramjot-Dhuswa Bund on left Bank of River Ghaghara (Saryu) in Distt.-Basti.