Loading…
Loading…
1,255 results • Recent activity
Procurement of various sizes of bearings below 80 mm Category Critical ( B) for various auxilliaries for AHP-IV Unit no. 10 and 11, STPS Sarni.
Installation of 90KW belt drive head of 1000mm belt conveyor complete with electricals at 56level 3rd belt in W7 panel of Bagdona seam at Tawa UG Mine, Pathakhera Area.
Procurement of GTC Sleeves for various shafts of Pumps such as CEP and ACW of Unit No. 10 and 11, STPS, MPPGCL, Sarni required for AOH of Unit No. 10.
Removal of old Tarfelt and grading work of roof slab and inside plaster of parapet of 102 Super C quarters at STPS, Sarni.
Procurement of Spares for Sam turbo make Silo Drain Sump Pump, Fly ash drain pump and column assembly , casing assembly,bearing Housing assembly of Bottom ash overflow pump installed in AHP of PH-IV STPS,Sarni.
Procurement of Agitator Gear box installed in HCSD system for disposal of dry fly ash in high concentration slurry form of Unit no. 10 and 11 of STPS, Sarni.