Loading…
Loading…
271 live157 closing this weekmost from Chief Engineer (Special Project) PHED, Jaipur and Directorate Local Bodies
271 results • Latest
Providing Household Service Connections( HSCs) including one Year Defect Liability Period under the Jurisdiction of Division Bharatpur
Construction of drainage scheme from Naval Kund and Apsara Kund Punchari to Goverdhan Drain and Renovation and Beautification of Radha Prem and Rasik Ananya Sarovar Jateri Dham Deeg
Rate contract of providing lying jointing and testing HDPE/DI pipe line including defect liability period of one year at Division Bharatpur in Urban/Rural area District Bharatpur.
Construction of drainage scheme from Naval Kund &amp Apsara Kund Punchari to Goverdhan Drain and Renovation &amp Beautification of Radha Prem &amp Rasik Ananya Sarovar Jateri Dham Deeg
PROVN OF TWO AC SHEDS AT BHARATPUR
REPAIR/MAINT OF INTERNAL ELECTRIFICATION FITTINGS, FIXTURES AT RMS DHOLPUR UNDER GE BHARATPUR
Ghati Cutting and Construction of Nagal to Tali road Tehsil Hindaun
भरतपुर जिले में एनएच-21 (किमी 78) से उच्चैन तक नवीन अलाइनलेंट पर सड़क निर्माण एवं उच्चैन से गहनौली मोड़ (एन. एच. 123) सड़क पर पिचूना, मदरियापुरा और सैदपुरा गांव में बाईपास निर्माण एवं सुधार कार्य
Poly Carbonate Shield (MHA) (V2) (Q2)
Diesel GENERATOR
Overlay works on 4LPS of Agra Bharatpur section from Km.17.756 to Km.62.295 of NH 11 (New NH 21) in the State of Uttar Pradesh an d Rajasthan on item rate (percentage) basis at the Risk and Cost of Concessionaire.
One Man Meals Ready to Eat (Menu No. 1) (V4) (Defence) (Q3) (3 (3 ))
Label Printer/Barcode Printer (Q2), Barcode Scanner (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
PROVN OF CHILDREN SCHOOL AT BHARATPUR MIL STATION
Cloth LFCD Disruptive Digital Pattern Uniform (MHA) (Q2)
Vest Thermal (MHA) (V2) (Q2)
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM