Loading…
Loading…
557 results • Recent activity
Cleaning, Sanitation and Disinfection Service - Outcome Based - office premises SCADA control room chemistry Lab POL room store rooms conformance hall or room office rooms of Fire station etc of surface installations Ankleshwar Asset; General Cleanin..
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
DM - carbon base: Coconut/Coal, Particle Size (Granulation) : 8 X 30 mesh, CPU - carbon base: Coconut shell, Particle Size (Granulation) : 12 X 40 mesh
hand held gps (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7019175 Dated : 30-12-2025 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1327500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 39825 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/13 in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer Directorate of Employment & Training, Block-1, 3rd Floor, Dr.Jivraj Maheta Bhavan, Gandhinagar, Gujarat, 382010 (Accounts Officer)
Custom Bid for Services - Transportation Loading Unloading and Handling of Hazardous Waste from NTPC Jhanor Similar Category Operation and Maintenance Power House/Power Plant
Phenolphthalein indicator (Q3), Silver Nitrate as per IS 2214 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6939336 Dated : 27-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Silver Nitrate as per IS 2214 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Auto CRAC Days 60 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No