Loading…
Loading…
152 results • Latest
Bawani Khera Block New Plantation and Maintenance Works rom 2026-27 to 2028-29
Bhiwani 1st Block New Plantation and Maintenance Works from 2026-27 to 2028-29
Online UPS, Split Air Conditioner, All In One Printer, Interactive Flat Panel Display, Computer Table, Chair without Armrest, Chair with Armrest, Dual Desk, Revolving Chair, Executive Table
Ground Floor of Bus stand consisting of Waiting hall, RCC Seat, Ladies, Gents and Disabled person toilet, Tea Shops etc.
Creation of 1 no 33 kV outgoing bay at 132 kV sub station Dadri l for terminating 33 kV Dadri ll Dadri l link line
Special Estimate for creation of 1 no 33 KV Line Bay at 132 KV S/Stn. HVPNL, Atela Kalan to accommodate the 33 KV S/Stn. Atela. Special Estimate for creation of 1 no 33 KV Line Bay at 132 KV S/Stn. HVPNL, Atela Kalan to accommodate the 33 KV S/Stn.
Special Estimate for Creation of 1 No 33 KV line Bay at 132 KV Sub-Station for terminating 33 KV Bhiwani (Bapora) -I.A. Bhiwani Link line FY 2022-23
Estimate for replacement old andObsolete and Air based mechanism 220 KV GCB controlling 100 MVA,220/132 KV T/F T-4 with replacement of some control cables at 220 KV S/Stn. HVPNL Bhiwani. Estimate for replacement old andObsolete and Air based mechan
Special Estimate for Erection of 33 KV Capacitor bank of capacity 10.872MVAR with allied Equipment on 40/50 MVA 132/33 KV T/F T- 3 at 132 KV S/Stn.HVPNL Miran