Loading…
Loading…
1,349 results • Latest
Kharif Rabi Procurement Stock Transportation, Unloading Work and LRT (Gunny Bags)/ Dhar Transportation Tender 2026- 3rd call
Kharif Rabi Procurement Stock Transportation, Unloading Work and LRT (Gunny Bags)/ Indore Transportation Tender 2026- 3rd call
Kharif Rabi Procurement Stock Transportation, Unloading Work and LRT (Gunny Bags)/ Shahdol Transportation Tender 2026- 3rd call
Kharif Rabi Procurement Stock Transportation, Unloading Work and LRT (Gunny Bags)/ Jabalpur Transportation Tender 2026- 3rd call
DEVELOPMENT OF A 50 MW GRID-CONNECTED GROUND MOUNTED SOLAR PHOTO VOLTAIC PROJECT WITH ENERGY STORAGE SYSTEMS (ESS) ASSURING 200 MWh OF PEAK POWER SUPPLY
PHONIC WHEEL (Toothed wheel)
FRP HOUSING WITH HAMMER FOR BREAKING WINDOW GLASS
Maintenance work of Jabalpur - Hiran River section of NH-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the State of Madhya Pradesh to four lanes with paved shoulders under NHDP-III on EPC mode on the risk and cost of the EPC
Maintenance of Goharganj to Bhopal section of NH-12 from existing Km 255/300 to km 301/200 and Obedullaganj bypass from existing km 278/450 of NH-12 to existing km 3/600 of NH-69 in the state of Madhya Pradesh to four lanes with paved shoulder on EPC
Knifing Stopper (Air Drying quality) to IS:5083/2023 (Third Revision) & Spec.ICF/MD/Spec.045 issue status-02,Rev-03. Packing in 20 Kgs. new non- returnable M.S. Drums to IS:2552/89 Gr. B-II. The date of supply of the material should be within 60 days from the date of manufacture.