Loading…
Loading…
1,257 results • Latest
Maintenance of Goharganj to Bhopal section of NH-12 from existing Km 255/300 to km 301/200 and Obedullaganj bypass from existing km 278/450 of NH-12 to existing km 3/600 of NH-69 in the state of Madhya Pradesh to four lanes with paved shoulder on EPC
Design Manufacture Supply Installation Testing and Commissioning of Heavy Duty Machine Room Less and Gear Less Lifts Heavy Duty Escalators and Moving Walks along with two years DLP followed by three years of CAMC
Knifing Stopper (Air Drying quality) to IS:5083/2023 (Third Revision) & Spec.ICF/MD/Spec.045 issue status-02,Rev-03. Packing in 20 Kgs. new non- returnable M.S. Drums to IS:2552/89 Gr. B-II. The date of supply of the material should be within 60 days from the date of manufacture.
Empanelment of Consultants and Architects Firm for Architectural Design and DPR Consultancy Service (Phase-2) NIT-72
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kV Bhopal-Itarsi DCDS line total 173 nos towers under TLM Sub Dn. Bhopal under administrative control of EE (EHT-M) Dn. Bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 5 Nos 132 kV EHV lines under TLM Sub Dn. Bhopal under administrative control of EE (EHT-Maint.) Dn. Bhopal