Loading…
Loading…
Found 8 active tenders
8 results • Latest
REPAIR/OVERHAUL OF LRU FOR HAWK MK-132 AIRCRAFT
SPECIAL REPAIRS TO CERTAIN OFFICERS MD ACCN AT AFS BIDAR
Taking down chowkats or frames exc 1.5 sqm and n.exc 4.0 sqm each but with shutters (without taking off shutters from the frame) complete all as specified and as directed.
MAINT AND REPAIRS TO SWIMMING POOLS ALONG WITH CONNECTED ITEMS AT AFS BIDAR
Repairs and servicing of suction sweeper comprising of 2 or 3 HP electric motors, rating at 0.8 power factor, 3 phase, 415 volts, 50 cycles per second directly coupled to centrifugal pump set to matching capacity 50x50 Suction/ Delivery, 1500 RPM, mounted on common foundation including replacement of parts complete all as specified and as directed.
PROVISION OF GEYSERS AND ASSOCIATED WIRING IN BLDG No PH 02 YOs MESS AT AFS BIDAR
All as per Serial Item No 1 here-in-above, but for One Ceiling Fan /Exhaust point /Wall mounted controlled by one 5 Amp switch all as specified and as directed
MAINT AND REPAIR / REPLACEMENT OF SECURITY / STREET / ROAD LIGHT / HIGH MAST LIGHTS ALONG WITH CONNECTED WORKS UNDER GE(AF) BIDAR
Disconnecting faulty/burnt end portion of under ground cable by removing cable from loop after necessary excavation & earth work, relaying and reconnecting the cable by removing faulty/burnt portion of incoming and out going cables at panel boards, preparing fresh terminals with suitable size of thimbles, lugs and glands or gland plates of suitable size and number of cables incoming out going to panel board, complete all as specified and as directed by Engineer-in-Charge. Note : Necessary excavation and earthwork, cables, cable protection works where required will be measured and paid separately under respective items.
SPECIAL REPAIRS / REPLACEMENT OF BER E/M EQUIPMENT AT AFS BIDAR
Supply, install, connect, test and commissioning of inverter type air conditioner Hi wall comprising of units Indoor & outdoor complete with cordless remote control unit, within built in air ioniser, Plasma filter for better indoor air quality, leakage detector etc with minimum 3 star rating and EER 3.2 of capacity 1.5 TR, inclusive of suction and discharge lines of suitable size and length of copper tube, necessary brazing and providing nitrile tubing over gas circulating copper tubes and neatly tying the ends with PVC insulating tape and mounting on suitable bracket, suitable drain pipe for disposal of waste water upto ground level and testing, neatly finishing the disturbed surfaces of walls to match with the surroundings complete all as specified and as directed. Make -LG/Voltas/Carrier/Blue star/Daikin/Hitachi