Loading…
Loading…
329 results • Latest
Supply of Fomesafen sixteen point eight percent W slash W ME Plus Propaquizafop five point two percent W slash W ME
Supply of Pendimethalin thirty percent EC
Supply of Ammonium Molybdate Mo fifty two percent
Supply of Disodium Octaborate Tetrahydrate B twenty percent
Supply of Thiomethoxam twenty five percent WG
Supply of Bio NPK Consortia cfu greater than five multiply ten to the power seven per gram
Panrui Batikar Road (MDR) from 1.00 kmp to 3.00 kmp urgent patch repairing work (in stretches) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum during 2026-2027.
Emergent Repairing and Maintenance work in different stretches of Nanoor-Basapara Road (MDR) from 0.00 Kmp to 3.00 Kmp,and 4.00 kmp to 6.00 kmp Under Birbhum Highway Division-II in the District of Birbhum, during the year 2026-27.
Batikar Kurmitha Road (MDR) from 1.30 kmp to 3.70 kmp urgent patch repairing work (in stretches) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum during 2026-2027
Patch repairing work from chainage 0.00 kmp to 5.719 kmp in stretches of Amba Atla Road under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2026-27