Loading…
Loading…
172 results • Latest
Pre Khariff maintanence to canal and canal bank including operation of gates at Bolpur, Head Quarter, Debogram, Albandha (I) Section under Bolpur (I) Sub Division within Mayurakshi South Canals Division for Khariff Irrigation 2026-27.
M-R of Canal Embankment of Minor 2 at Ch. 120 an Ch.123 and Desiltation of Canal Minor-2 in between Ch. 45.00 an ch.90.00, Minor-1 in between Ch.120.00 andCh. 160.00 and Dy-4 in between ch.223.00 and 256.00 under Bahiri (I) Section in Block- Nanoor,
Pre khariff maintenance work to Canal and Canal Bank including operation of gates of Hinglow Main Canal under Hinglow (I) Sub Division during the Khariff irrigation 2026-27.
M-R to Dy-7 (from ch. 40.00 to Ch. 46.00 ) and M1, M2 of Dy-7 of KSMC, located in Block Labpur, District- Birbhum under Kirnahar (I) Sub-Division within Mayurakshi South canals Division.
REMOVAL OF DIPOSITED EARTH INBETWEEN CH 0.00 and CH 130.00 OF DY-10 AND OFFTAKE OF MINOR I and MINOR II OF DY-10 OF KSMC UNDER KIRNAHAR IRRIGATION SUBDIVISION BLOCK NANOOR DIST BIRBHUM
Pre-Kharif Maintenance Works of Canal and Canal Banks under Kirnahar (I) Section, Nanoor (I) Section and Bipratikuri (I) Section of Kirnahar (I) Sub-Division for Kharif Irrigation during 2026