Loading…
Loading…
170 results • Recent activity
Utility Shifting of Korsontola Pipe Water Supply Scheme under SOPD for the year 2025-26 under Tezpur Division No-I, Tezpur, Sonitpur
MMPPNA_RIDF_XXXI_25_26_163 Construction of Road from Serelia PWD Road to Bongaon under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
CONSTRUCTION OF TOURIST CUM PASSENGER JETTY AT BISHWANATH GHAT IN ASSAM
Heavy duty longspan storage System (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2026/B/7124222 Dated : 27-01-2026 Bid Document 1/14 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1046369.72 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Flash Light (Q4) (3 (3 ))
Tranqulizer Gun (Q3) (3 (3 ))