Loading…
Loading…
27 results • Latest
PURCHASE OF COMPUTER PRINTER UPS AT BUNDI
ITEMS
CONSTRUCTION ACR GOVT. SR. SEC. SCHOOL KESHOPURA
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
CONSTRUCTION ACR AND OTHER WORK GOVT. SSS MAKHIDA
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
CONSTRUCTION ACR AND OTHER WORK GOVT. SR. SEC. SCHOOL NEEM KHEDA BLOCK NAINWA
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 Mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming and disposal of surplus excavated soil as directed within a lead of 50 Mtr.
CONSTRUCTION TEEN SHED WORK GOVT. SR. SEC. SCHOOL DELUNDA BLOCK TALERA
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
PLAY GROUND DEVLOPMENT AND BOUNDRY WALL CONSTRUCTION WORK GOVT. SR. SEC. SCHOOL ONKARPURA
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils