14 live10 closing this weekmost from Sjvn Limited and Planning & Development Department Bihar
14 results • Latest
Construction of approach road from State Highway-17 (Buxar Sasaram Road) to Mura Baba Temple inside STPL Plant Boundary at Chausa, Buxar (Bihar)
High Mast Lighting Towerforlargeareawith LED Flood Lighting System (Q3)
Chest Press - Outdoor Gym Equipments (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) 3 3
HMB Mechanism For 400/220KV Breaker (1-Ph) " Make- Hitachi Or ABB Model- HMB4 For SP3-1, Disconnector Switch (1-Ph Complete Module Without Drive Mechanism) " " Make- Hitachi Or ABB Model- ELK, Disconnector Switch (Drive Mechanism), Days Disconnector With Earth Switch (1-Ph Module Without Drive Mechanism) " " Make- Hitachi Or ABB Model- E, Fast Acting Earth Switch (1-Ph Module Without Drive Mechanism) " " Make- Hitachi Or ABB Model- ELK-EB3, Days Surge Arrestor For GIS Busduct-400KV With Surge Monitor" Make- Hitachi Or ABB Model- ELK-AZ32M ZINC, Surge Arrestor For GIS Busduct-220KV With Surge Monitor" Make- Hitachi Or ABB Model- ELK-AZ14F ZINC, Delivery Days Gas Density Monitor" Make- Hitachi Or ABB Model- ELK-WT3", Rupture Disc (Pressure Relief Device) " Make- Hitachi Or ABB Model- ELK-XA, Days Close Cone (Gas Barrier Insulator) Partition Insulator" Make- Hitachi Or ABB Model- ELK-3", Bypass Cone (Support Insulator) Partition Insulator" Make- Hitachi Or ABB Model- ELK-3, Days Voltage Transformer-400KV Bus VT-3 Core" " Make- Hitachi Or ABB Model- ELK- PI3/420 (ELK-3/420), Voltage Transformer-220KV Bus VT-3 Core" " Make- Hitachi Or ABB Model- ELK-PI14 (ELK-14/300), Delivery Days OPDM Sensor Make- Hitachi Or ABB, Drive Control ELK-BAC Make- Hitachi Or ABB, Drive Control ELK-BAE Make- Hitachi Or ABB, Close Cone (Gas Barrier Insulator) Partition Insulator" Make- Hitachi Or ABB Model- ELK-14", Bypass Cone (Support Insulator) Partition Insulator" Make- Hitachi Or ABB Model- ELK-14"
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Based Information Display System (Q4)
Procurement of Conveyor Idlers for Coal Handling Plant (CHP) of 2× 660 MW BTPP
Casing wear ring (C), Sleeves SUCTION, DISCHARGE, Mech. seal, DE &NDE Strainer Aux. Boiler.
Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Leg Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3) 3 3
Valve Positioner Spares for Boiler & Turbine Area of BTPP (2x660 MW) from OEM/OES- M/s ABB India