Loading…
Loading…
3,075 results • Latest
Construction of Kerb Channel around Bharat Mandapam on Mathura Road from W point Tilak Bridge to DPS, Bhairon Marg and Ring Road Bhairon Mart T-Point to IP Flyover under Sub Div-3 of Division C and ND-Roads (M-413), New Delhi during 2025-26.
Replacement of old and damaged sewer line from H. No. 8/28, WEA Karol Bagh to 8/32, WEA Karol Bagh in Rajinder Nagar Constituency AC-39 under EE(Civil)-16.
A/R and M/O to PWD Roads under Sub Division - 3 of Division C and ND - Roads (M-413) during 2025-26. (SH - Construction of Kerb Channel at Nishad Raj Marg, IP Marg, Ring Road from IP Flyover to Rajghat, Sachivalaya Road and Loop).
Replacement of old and damaged/settled sewer line from WZ-135 to WZ-137, Naraina Village in Rajinder Nagar Constituency AC-39 under EE(C)-16.
Repair and maintenance of sewerage system after 01/11/2025 in Inderpuri Ward No. 140 in Rajinder Nagar Constituency AC-39 under EE(Civil)-16 (Re-invite).
Tracing and repairing of 12 inch (300mm) dia. main water line leakage at different locations as and when occurred from Jhandewalan BPS to Old Rajinder Nagar UGR, Double Storey New Rajinder Nagar to R-Block UGR under EE(Civil)-16