Loading…
Loading…
244 live208 closing this weekmost from Minor Irrigation Department and East Central Railway
244 results • Latest
Comprehensive Annual Maintenance Contract of Siemens make Electronic Interlocking of DDU Division for 02 years.
Repair work of 06 Nos E Type quarters, 06 Nos C Type, 2 nos F type quarters and 01 Nos B Type quarter at ERPL Mughalsarai
Annual Maintenance Contract of DRM Intercom at DRM Office DDU for 02 Years.
Pad Lock as per DGQA Specification No. IND/GS/1909 (V2) (Q3)
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Q2)
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Public Safety, Supply, installation, testing and commissioning for Sensor based Early Train Detection and Warning/Alarm System (Jan Rakshak) at MRO/TPRO location; As per ATC; As per ATC; As per ATC
Supply, install, testing and commissioning of CCTV cameras at HPCL Mughalsarai IRD
Provision of High Level platform at IMGE and KSTA station in GC section under ADEN/Gaya.
Annual Maintenance Contract for Caterpillar make Engines mounted on various track machines for the year 2026-27 & 2027-28 with M/s Gainwell Commosales Pvt. Ltd.,an authorized dealer of M/s Caterpillar Pvt. Ltd., on single tender basis.
Provision of 03 M FOB and High Level Platform at Pahleza (PHE) Station in G.C. Section under ADEN/DOS.
Proposal for 03 M FOB and HL platform at CPBH station under ADEN/DOS.
Strengthening of bridges by grouting and jacketing of Minor Bridge No. 464,470,478,483,574,595,539,542,543 and replacement of RCC slab of Bridges No. 477,545,550,549,535A & 546 under Sr.DEN(II)/DDU.
Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 12.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 15.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 17.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 20.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 22.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 25.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 27.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 30.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 35.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 40.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 45.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 50.0 H. P
Re-E-Tender fpr The Sale of Old Empty Jute and Plastic Bags of Raw Materials
Shifting of OHE on feeder mast in phase manner also replacement of overaged cantilever in DDU division.
Renewal of Canal Service road of RK Canal from KM 8.520 to KM 12.500
Renewal of Canal Service road of CP Dam Top from KM 0.000 to KM 1.600
Renewal of Canal Service road of Baburi DY from KM 10.900 to KM 12.500
Renewal of Canal Service road of Kapasia Minor from KM 6.200 to KM 7.400
Work of shifting of T/F installed in the premises at Bechupur and Electrification of new electricity connections to the M/s S. Ram Hospitality, Pro. Ravindra Nath Singh and Jai Baba Industries under the Deposit Scheme in EDD-IInd, Mgs.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Substation; Switchyard, Power House Equipment, Substation; Service Provider
Inspection of 01 no. bridge and 04 no. of Bow string girder ROBs of GC section of DDU division using high resolution image &video capture UAV DRONE" under SSE/BR/DDU. (Br no.345/DN between station GAYA-MPO at Km-466/21-467/15, and Bow String Girder spans of ROBs (1x60M) between DOS-PHE at Km-556/25-27, ROB(1x60M) in bet. station PHE-KWD at Km-562/11-13, ROB(1x60M) PHE-KWD at Km-564/19-21,ROB(1x60M) between KWD-SSM at Km-566/19-21).
Provision of wheel wise load measurement by DDU EIMWB.
Supply and installation of 42 kV lightning Arrester (LA) with accessories in system-I and Modification of LA installed in system-II at various Power Supply Installation (PSI) in 2x25 kV OHE unit under CGM/DDU.
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Others
Custom Bid for Services - Conducting independent third party impact assessments Group A Open Gyms at 15 locations and distribution of sewing machines to 1145 underprivileged women in Chandauli District, Custom Bid for Services - Conducting independent third party impact assessments Group B Installation of 190 Solar based High Mast Lights in the district of Madhubani, Bihar, Custom Bid for Services - Conducting independent third party impact assessments Group C Providing 250nos Solar Streetlights in Rural Areas and 82nos Smart Classrooms in Government Schools in Patliputra Constituency Bihar, Custom Bid for Services - Conducting independent third party impact assessments Group D Providing Water Purifiers with Water Coolers in 171 nos of Government Schools and Colleges of Rohtas and Kaimur Districts Bihar Similar Category CSR Project Monitoring, Evaluation and Impact Assessment Service CSR Project Monitoring, Evaluation and Impact Assessment Service
Work for replacing of 03 No. Control Panels on 04 No 132kV Bays and for installation of 02 No DCDBs at 220kV Substation Sahupuri under Electricity Transmission Division-III, Sahupuri
Chandauli B well of Smt Basnti w/o Ram Dulare