Loading…
Loading…
89 results • Latest
Package No 46 Construction of Class Rooms under Assam School Education and Adolescent Well-Being Project (ASAP) under Sivasagar DTBD for i. Rupahimukh Janajati H.S ii. Santak High School
Custom Bid for Services - HIRING SERVICE CONTRACT FOR CARRYING OUT ELECTRICAL SYSTEM ADEQUACY STUDY FOR DETERMINATION OF OPTIMUM CAPACITY/RATING OF NEW GAS ENGINE GENERATOR (GEG) FOR BCPL, LAKWA PLANT Similar Category Support Services
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for Bishrampur HSS under Choraideo DTBD ( Package-54)
Construction of Bridge in Charaideo District i) Br.No. 1/1 on Ghurajan and Garakhiapam connecting Road
Re-Construction of RCC Box Culvert No.4/1 on Kakotibari Batua Road under SOPD-G for the year 2025-26 (Mahmora LAC) Pkg. No. SE_CSRC_SOPD-G_ MAHMORA _25_26_01
1FLP SPLIT AC 2 Tons, 2REFRIGERANT PIPE CU SUITABLE FOR 2 TON, 3INSTALLATION OF FLAMEPROOF AC LAKWA PART A, 4 STNDNG SPLIT AC 415V 50 HZ R 22 4 T, 5REFRIGERANT PIPE FOR 4 T STNDG SPLIT AC, 6CAP SPLIT AC BEE 4 VAR INVERTER 2 TR, 7STNDNG SPLIT AC 415V 50 HZ R 22 4T, 8CU PIPE FIVE BY EIGHT INCH SPLIT AC, 9CU PIPE ZERO POINT TWO FIVE INCH SPLIT AC, 10DRAIN PIPE 4 POINT 5 TON TOWER AC, 11CAP SPLIT AC BEE 4 VAR INVERTER 2 TR, 12COMPRESSOR 2 TR, 13CONDENSOR COIL H 25 POINT 5 X L 33, 14COMPRESSOR FOR BLUE STAR 4 TR, 15COMPRESSOR 1 POINT 5 TR, 16COPPER CONDENSOR COIL, 17CU PIPE ZERO POINT FIVE INCH SPLIT AC, 18CU PIPE THREE BY EIGHT INCH SPLIT AC, 19BLOWER MOTOR MODEL NO YDK 50 4E, 20COPPER CONDENSOR COIL, 21POWER CONTACTOR VOLTAGE 240 VAC, 22BLOWER MOTOR, 23CONDENSOR COIL H 36 X 33 L, 24COMPRESSOR DAIKIN JT160GABY1L, 25CAPACITOR METALLIC 50 MFD, 26CAPACITOR 440V AC 3 MFD, 27CAPACITOR 440V AC 6 MFD, 28CAPACITOR 440V AC 5 MFD, 29BAKELITE CONNECTOR 30A 220V AC 3 WAY, 30BAKELITE CONNECTOR 30A 440V AC 5 WAY, 31UNIVERSAL AC PCB, 32NITRILE INSULATION COVER 19 MM, 33NITRILE INSULATION COVER 13 MM, 34COPPER BRAZING ROD 15 POINT 7 INCH, 35BRAZING GAS CANISTER 400 GM, 36TEFLON TAPE 12 MM X 10 MTR, 37BRAZING TORCH GUN HVAC, 38MANIFOLD GAUGE FOR R 22, 39WASHER PUMP 70 BAR AC
Raising and strengthening of Darika bund left bank from Bahgarh to AT road including anti-erosion measures at different reaches (Ph- II).
Supply of 360 nos. of High Efficiency Cellulose Media Air Filter for GE/BHEL make Frame-5, 20 MW Gas Turbine Inlet Air Filter System of GT Unit #6 at Lakwa Thermal Power Station (LTPS), APGCL.
Digital Portable Multiple Gas Detector (Oil India Limited-0C000295) ( 30 the number pi ), Portable Gas Detector (Oil India Limited - 0C000017) ( 1 the number pi )
Cleaning of Jamuna canal around Sivasagar, Borpukhuri (Under SDMF)
5 150class SLIP ON FLANGE SS304, 8 150class SLIP ON FLANGE SS304, 12 150class SLIP ON FLANGE SS304, 5 150 class stubend B16.9 F304, 8 150 class stubend B16.9 SS304, 12 150 CLASS STUBEND B16.9 F304, 7HEX HD BOLT W NUT M6X40MM HT B7 2H, 8HEX HD BOLT W NUT M6X60MM HT B7 2H, 9HEX HD BOLT W NUT M8X40 MM HT B7 2H, 10HEX HD BOLT W NUT M8X60MM HT B7 2H, 11HEX HD BOLT W NUT M10X40 HT B7 2H, 12HEX HD BOLT W NUT M10X50 HT B7 2H, 13HEX HD BOLT W NUT M10X70 HT B7 2H, 14HEX HD BOLT W NUT M12X75MM HT B7 2H, 15HEX HD BOLT W NUT M12X100MM HT B7 2H, 16HEX HD BOLT W NUT M16X80MM HT B7 2H, 17HEX HD BOLT W NUT M16X100MM HT B7 2H, 18STUD WITH 2NUT M6X150 HT B7 2H, 19STUD WITH 2NUTS M10X50MM HT B7 2H, 20STUD WITH 2NUTS M10X70MM HT B7 2H, 21STUD WITH 2NUTS M10X100 HT B7 27
Construction of Rural Haat Market Shed Complex in Charaideo District (Dilli Haat Model)
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for Juktali HSS under Sivasagar DTBD ( Package-83)
ASOM_MALA_3.0_25_26_28 Improvement and Upgradation of Dhodar Ali from Sapekhati Chari Ali to Near Borhat Lefera Tin Ali under Asom Mala 3.0 under Charaideo District Territorial Road Division, Sonari
Single Use Sterile Rubber Surgical Gloves Conforming to IS 13422 (Q2), Single Use Medical Examination Gloves Conforming to IS 15354 (Part 1) (Q2) (3 (3 ))
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for Demow HSS under Sivasagar DTBD ( Package-81)
CONSTRUCTION OF 500 SEATER CAPACITY AUDITORIUM WITH CONFERENCE HALL AT MORAN
Conservation, Restoration and Rejuvenation works of the Sagarbera Beel under Charaideo District under the Assam SWIFT Project
INSTALLATION OF PORTABLE WATER SUPPLY
SLING 8MM X 2.5METER SINGLE WIRE ROPE S, SLING 1/2" X 2METER SINGLE WIRE ROPE SO, SLING 1/2" X 5METER SINGLE WIRE ROPE SO, SLING 12MM 6 MTR CHOKER SLING WIRE ROPE, SLING 16MM X 10' SINGLE WIRE ROPE HARD, WIRE ROPE SLING 16MMX10FT, WIRE ROPE SLING 16MMX(6X24) CORE 20 FT, SLING 3/4" X 2METER SINGLE WIRE ROPE SO, WIRE ROPE SLING DIA 19 MM X2, SLING 19MM X 10' SINGLE WIRE ROPE HARD, WIRE ROPE SLING 19MM X 25FT, SLING 19MM X 30' SINGLE WIRE ROPE HARD, W/R SLING 19MMX11M WITH 12" SOFT EYES, WIRE ROPE SLING 19MMX41', WIRE ROPE SLING 19MMX22 MTR, WIRE ROPE SLING 22MM(6X24) 10FT 3.2T SA*, WIRE ROPE SLING 22MM X 18FT, SLING 22MM X 10METER SINGLE WIRE ROPE S*, WIRE ROPE SLING 22MM X 9M, WIRE ROPE SLINGS 1" X8MTR, SLING 25MM 35FT SINGLE WIRE ROPE 1 END*, G- HOOK SAFETY SLING 12.5 TON, WIRE ROPE SLING 35MM X 65FT, SLING 40MM 5 METER SINGLE WIRE ROPE BOT*, G- HOOK SAFETY SLING 20.0 TON, WIRE ROPE SLING DIA 44 MM X20*, WIRE ROPE SLING 52MM X 65FT, WIRE ROPE SLING DIA 52 MM X28*, WIRE ROPE SLING 52MMX100', SLING 19MM X 30' 2 WAY WIRE ROPE HARD E*, SLING 19MM X 12METER 2 WAY WIRE ROPE MA*, SLING 1" X 6 METER 2 WAY WIRE ROPE MAST*, W/R SLING 12MMX10'/3T/4WAY/EXTRA 4RING, 4 WAY SLING 16MM X (6X24) CORE 10 FEET, SLING 16MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 19MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 22MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 7/8" X8 METER 4 WAY WITH MAIN AND*
Improvement of K P Chaliha Road from the junction of A T Road up to Padmadhar Chaliha Statue and Kalibari Road part at Ward No IX AND X of Sivasagar Municipal Board under NCAP 2024-2025
Improvement of Mahatma Gandhi Road by widening with concrete pavers block on both side from junction of K P Chaliha Road up to 809 M at Ward No X of Sivasagar Municipal Board under NCAP 2023-2024
Improvement of Babupatty Road Akshay Ghosh Road by widening with concrete paver block on bothe side from the junction of Dolmukh Chariali up to junction of West Jamuna culvert at Ward No V AND XII of Sivasagar Municipal Board under NCAP 2024-2025
High Volatge Phase Comparator
Construction of New PHC at Doba Tiniali SC in Charaideo District under XV-FC Health Grant under NHM, Assam
Construction of New PHC at Borhat MPHC in Charaideo District under XV-FC Health Grant under NHM, Assam
ReConst of (1) ChengelimoraJorhatia Road (2) KhamunPahuchungi Road (3) Kheroni to Nirmalia Road (4 )Deogharia to Helaiguri Road under MMPNA under SOPD-G for the yaer 2025-26
ReConst of 1) Bishrampur to Himpora Rd 2) LukhurakhanPoromoni Rd 3) BishrampurPorosoni 4) Rd frm Majpathar to Barpathar 5) Rd frm Hologuri to Chakalia under MMPNA under SOPDG fr the yr 2025-26
Construction of Chain Link Fence with R.C.C. Post Having 2 Lines of Barbed Wire At Top and One Line at Bottom (Total 3 Strand Barbed Wire) in 50 Ha. AR Plantation at Sola RF under Sonari Range of Sivasagar (T) Division under State CAMPA Scheme
Construction of Forest Guard Quarter at Borhat Range Headquarter under State CAMPA Scheme for the year 2025-26
CE/EAP/ARRBP/OCB/ Bridge1/Charaideo/9 Construction of Bridge in Charaideo District i) Br.No.1/3 of Aideobari Road
1)Imp/Re-Const of Dharampather Rd 2) Impr/Re-Construction of Bogoriguri Rd 3)Imp/Re-Const of Rajapukhuri Rd 4) Impr/Re-Const of Rd Frm Dhodar Ali to Lawjan 5) Imp/Re-Const of Rd From TiokiaKherbari Rd under (MMPNA) under SOPD-G for the year 2025-26
Turnkey Construction of 01 (one) no. of 33kV OIL Feeder Bay including Civil works at 132kV Moran GSS, AEGCL
Potassium Hydroxide for Drilling Fluids (ONGC) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7080792 Dated : 07-01-2026 Bid Document 1/12 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 23 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/12 Beneficiary : F&AO Central Procurement Department - CMPG (Chemical), 8th Floor, Core 4, Scope Minar, Laxmi Nagar, Delhi-110092 (Oil And Natural Gas Corporation)
DGR Empanelled ESM Security Services
Sofa (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7031284 Dated : 22-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Refilling of Medical Gases in Cylinders
PIPE WRENCH 12 inch, PIPE WRENCH 18 inch, PIPE WRENCH 24 inch, PIPE WRENCH 36 inch, HEAVY DUTY PIPE WRENCH 48inch, RING SPANNER SET, SPANNER SET, ADJUSTABLE SPANNER 12INCHES, SLEDGE HAMMER WITH HANDLE, BRASS HAMMER 10LBS, U Clamp for 14mm wire rope, U Clamp for 16mm wire rope, U Clamp for 19mm wire rope, U Clamp for 22mm wire rope, U Clamp for 35mm wire rope, U Clamp for 38mm wire rope, Ring Slugging Wrenches (Spanners) - as per IS 4509 (Q4), Open Ended Slugging Wrenches (Spanners) as per IS 4508 (Q4), Chain Pipe Wrenches as per IS 4123 (Q4)
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7138231 Dated : 23-01-2026 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise consignee wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI Schedule 1 EMD Amount (In INR) 3173400 Schedule 2 EMD Amount (In INR) 528900 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 29 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/11 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Manager Materials (IP) Materials Department, Oil India Limited, Duliajan, District - Dibrugarh, Assam - 786602. The vendor shall submit to OIL the copy of the SFMS message as sent by the issuing bank branch along with the original bank guarantee. E-mail id of Buyer: "[email protected]" (Oil India Limited) (Partho Nath)