Loading…
Loading…
436 results • Latest
Test Leads (Q3), Digital Multimeter (Q3), true rms clamp meter (Q3), Insulation Tester (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Supply and safe delivery of SMPS STEP-PS 1AC 5 DC 6.5 Part code 2868541 make phoenix contacts, Supply and safe delivery of SMPS STEP-PS 1AC 24DC 4.2 Part code 2868664 - make phoenix contacts, Supply and safe delivery of SMPS Part code ABL2REM24150H, 24V DC, 14.6A, make Schneider, Supply and safe delivery of SMPS 24V, 6.5A, model-LRS- 150-24, make Meanwell, Supply and safe delivery of auto changeover switch as per the specifications
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
Engaging Essential Service for Block C with 116 MSB Residential flats in S.No 42pt of Rajakulipet Village, Chengalpet Taluk from 16.07.2026 to 31.10.2026
Power Contactor
Installation of permanent piping system for resin removal and loading from SSSB water purification Ion-exchange column for remote handling of resin in fuel building of PFBR