Loading…
Loading…
4,369 results • Latest
AS PER NIT
AS PER NIT
AS PER NIT
Installation of cold drinking water project near the house of Manu Barman at Part no.08 by 230 under Balarampur-I G.P of Tufanganj-I Block.
Installation of cold drinking water project near the house of Alok Bakkar at Part no.08 by 237 under Balarampur-I G.P of Tufanganj-I Block.
CONSTRUCTION OF CC ROAD FROM THE HO AMAL SARKAR TO THE HOUSE OF KALI BINAY DEY VIA RANA DAS HOUSE AT PART NO. 08 BY 230 UNDER BALARAMPUR-I G.P.(ACTIVITY ID-110090661)
CONSTRUCTION OF CC ROAD FROM THE HO MAHENDRA BARMAN TO THE HOUSE OF DHAULU BARUA AT PART NO. 08 BY 237 UNDER BALARAMPUR-I G.P.(ACTIVITY ID-110090729)
Instalation of disabled person Ramp for all Govt Officess at GP area under Ranirhat Gram Panchayat. (ID- 109378676/2025-26)
REPAIRING OF RBM ROAD FROM THE HOUSE OF MOSARAF HOSSSAIN TO 8 NO. GATE WITHIN BOOTH NO. 7/218 BOSKOTAL
Supplying ,Installation , Testing and Commissioning of 7KWP off- Grid / Hybrid Rooftop Solar PV Power Plant for Ranirhat Gram Panchayat.
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF PABITRA BARMAN TO HOUSE OF KRISHNO SEN WITHIN BOOTH NO. 7/218
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF ABDUL KARIM TO HOUSE OF ABDUL SEKH WITHIN BOOTH NO. 7/218 LENGTH 100 MTR
CONSTRUCTION OF CC ROAD FROM HOUSE OF HYDAR ALI TO PURNA MOHANTA HOUSE, .WITHIN BOOTH NO-221 ROAD LENGTH 100 MTR
CONSTRUCTION OF CC ROAD FROM HOUSE OF NAGIR SEKH TO BANKIM BARMAN HOUSE, APPROX 100 MTR. WITHIN BOOTH NO-221
CONSTRUCTION OF CC ROAD FROM HOUSE OF MAJID SEKH TO JALALUDDIN ANSARI HOUSE, APPROX 100 MTR. WITHIN BOOTH NO-221
CONSTRUCTION OF CONCRETE ROAD FROM PEGIYA SARKAR HOUSE TO BUDHU ORAON HOUSE, ROAD LENGTH 203 MTR.WITHIN BOOTH NO-223
REPAIRING OF ROAD NEAR HAJITARI MATHUPAR NEAR DHAPRAHAT.WITHIN BOOTH NO-213
EARTH WORK SHUTTERING CONCRETING PIPE LINE WORK INSTALLATION OF SOLAR PANEL AND SOLAR PUMP ERECTION OF STEEL WORK ETC
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF SIRAJUL HOQUE TO THE HOUSE OF EJAJAL SEKH WITHIN BOOTH NO 7/215 LENGTH 175 MTR
EARTH WORK SHUTTERING CONCRETING PIPE LINE WORK INSTALLATION OF SOLAR PANEL AND SOLAR PUMP ERECTION OF STEEL WORK ETC
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF MANDAL SEKH TO THE HOUSE OF MAHABUB RAHAMAN WITHIN BOOTH NO 7/215 LENGTH 240MTR
Tab Amoxicillin 500mg and Potassium Clavulanate 125mg, Diclofenac Sodium 50 mg and Paracetamol500mg Tab, Amoxicillin200mg and Clavulanic Acid228.5 mg Syp, Powder ORS, Tab Ranitidine 150 mg, Inj Pantoprazole IV 40mg, Dried Aluminium Hydroxide 250 mg Magnesium Hydroxide 250 mg and Activated Dimethicone 50mg, Calcium vitamin D Tab, Inj T T 0.5 ML, Tab clopidogrel bi Sulphate 75 mg, Inj Dicyciomine 20 mg avd Paracetamol 500mg, Inj Ondansetron 4mg, Tab Traexamic acid and Ethymsylate, Inj Traexamic acid 500mg, Tab Ondestron 4 mg, Tab Folic acid 5mg, Tab Fluconazole 150mg, Syrup Cetirizine 5mg 30ml, Ear drop Benzocaine Chlorbutol Paradichlorobenzene Turpentine Oil, Diclofenac gel 30 gram, Powder clotrimazole 120 gram, Inj DNS, Trypsin Chymotrypsin 100000IU, Inj Artesunate 60 mg, Tab Primaquine 15 mg, Amoxicillin200mg and Clavulanic Acid 457.5 mg Syp, Inj Artemether, Tab Chloroquine 500 mg
Sitalkuchi Gosanimari road at 09th kmp of Giridhari -I Bridge approach , fitting , fixing metal beam crash barrier , othe allied works , under Coochbehar Highway Division in the district of Coochbehar.
REPAIRING WORK
AS PER NIT
REPAIR WORK
REPARING WORK
REPAIR WORK
Adabarighat Sitai road from ch. 1.00km to 6.00 km (in stretches) , clearing grabbing road land including surface drains in soin construction of Mathabhanga Highway Sub-Division , under Coochbehar Highway Division in the district of Coochbehar
REPAIR WORK
REPAIR WORK
REPAIR WORK
REPAIR WORK
Maintainance of Joyee Bridge Approach Road Mekhliganj End including Mending Raincuts and allied works under TBCD, Mekhliganj, Coochbehar in the year 2026-27 2nd call
REPAIRING OF CC ROAD LENGTH 420MTR(APPROX) FROM TETULTALA TO IBB GATE NO 19 ROAD WITHIN BOOTH NO 7/216 SEUTI PART-II AP SCHOOL
Sitalkuchi Gosanimari road from ch. 08.00km to 13.00 km (in stretches) , clearing grabbing road land including surface drains in soin construction of Mathabhanga Highway Sub-Division , under Coochbehar Highway Division in the district of Ccob
Supply of different type of Laboratory materials with equipments related to Integrated Science Lab
REPARING WORK
REPARING WORK
REPARING WORK
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
CONSTRUCTION OF CC ROAD 95 MTR (APPROX) FROM THE HOUSE OF SAHERAN BEWA TO HOUSE OF AMISAR HOQUE WITHIN BOOTH NO 7/216 SEUTI PART-II AP SCHOOL
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT