Loading…
Loading…
57 results • Latest
Construction of CC Road at various places at Civil ward 07.
Construction of CC Road and RCC Drain at Asati ward 02. 1.) CC Road and RCC Drain from Madhuvan Palace to Raju Jain 2.) CC Road from Dharmshala to Vikky Paan
Construction of CC Road from Ram Mandir to Arvind Thakur at Bajariya ward 06.
Construction of CC Road at various places at Civil ward 10.
DRILL PIPE SHORT, 5" IUE S-135, 19.5PPF, 1 MTR, RH, DRILL PIPE SHORT 5" IEU, S-135, 1.5 MTR, 5" OD, LENGTH-2M 19.5 PPF, GR S-135, DRILL PIPE SHORT 5" OD 19.5PPF 3MR LONG, DRILL PIPE SHORT 5" OD 19.5PPF 4MR LONG, G-105, DRILL PIPE SHORT5" IEU, 3 MTR, 5" IUE S- 135, 6 MTR, PUP JOINT 4-1/2 IN IF PIN X 4-1/2 IN IF, 5 FEET, S-135 Grade, PUP JOINT 4 1/2" IFPX4 1/2" IFB LENGTH 10 FEET, PUP JOINT OD-3- 1/2" 13.3 PPF, EU/RH, 4 FEET, PUP JOINT OD-3-1/2" 13.3PPF, 6 FEET, EU/LH, 6 FEE, 3 FEET, PUP JOINT OD 2.7/8" 10.4 PPF, G105, PUP JOINT OD-2-7/8" 10.4 PPF, G-105 EU RH, 9 FEET, PUP JOINT 2.7/8" OD G105 10.4 PPF, RH LENGTH 3 FT(IF (NC-31) ) 3 ft length, LH LENGTH 3 FT (IF (NC- 31) ) 3 ft length, LH LENGTH 12 FT(IF (NC-31) ), 2.5 MTR, 5 MTR, 19.5PPF* 4 m length
Short Term Maintenance estimate for highway from km 1 to 35, 44 to 50 and 56 to 71 Total length 58 Km on NH - 34 Damoh-Hirapur Road in the State of Madhya Pradesh
Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode