Loading…
Loading…
570 results • Latest
COMPLETE INTERIOR FRP PANELS IN DRIVERS CAB FOR MEMU DMC 3-PHASE, as per Drawing: MEMU/DMC/3PH-9-0-013 Alt - C WITHOUT ITEM NO- 1 & item from Sr. No.33 TO 37
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Sanitary Napkins Vending Machines (Q3), Sanitary Napkins Incinetator Machine with Smoke Control Unit (Q3)
RO Plantwith Gensetand Trolley (Q3)
Renovation of campus light and garden light at DM residence, Laheriasarai, Darbhanga.
RO Plantwith Gensetand Trolley (Q3)
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3)
S/R to E/W & E/I in the Commissioner residence, House, campus and Garden light at laheriasarai, Darbhanga.
SET OF HAND HOLD ARRANGEMENT WITH METRO TYPE HAND HOLDS FOR 3 PHASE MEMU/DMC COACHES.
S&I E.P BRAKE EQUIPMENT FOR MEMU/DMC/3PH/MRVC/C/BT COACHES FOR MEMU- 12 CAR WITH CGL ELECTRICS
GROUP NO.- 03 Name of Work :- Construction of :-(i) Road and drain rising from Main Road Pili Mashjid Yogendra Ram Home to Rajesh Mahto Home upto Meni Saheb Home - (b) Late Ramdev sah home to Ramkripal Mahaseth upto dyashankar sah home (c) Road from Rambaboo home to Amola ram home upto Debu ram home (d) Drain from Ganesh mahaseth home upto Brahmaathan (e) Road and drain from Santosh Purbey home upto Rajkumar sah home (f) Road and drain in Teachers coloney / tiger gali (g) drain from Anil sah home upto Late Ramdyal Sah home (h) rising of Road from Kumari Veena home upto Ranjeet mahaseth home. (PART) in Ward No.-05.
GROUP NO.- 26 Name of Work :- Construction of drain slab and road at Dharmpur durga mandir parisar , 3 nos culvert in Ward 16.
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
RO Plant with Genset and Trolley (Q3)
RO Plant with Genset and Trolley (Q3)
RO Plant with Genset and Trolley (Q3)
RO Plant with Genset and Trolley (Q3)
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3)
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3)
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3)
RO Plant with Genset and Trolley (Q3)
RO Plant with Genset and Trolley (Q3)
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Admin, Manpower Outsourcing Services - Minimum wage - Semi-skilled; literate; Admin, Manpower Outsourcing Services - Minimum wage - Unskilled; literate; Admin
RO Plant with Genset and Trolley (Q3)
Repair and Overhauling Service - cars; COMPLETE VEHICLE TRACTOR HEAVY DUTY; Yes; Buyer Premises
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))
GROUP NO.- 50 Name of Work :- Construction of RCC Drain and Pcc road in ward no.28, 1. from house of bhawesh to chandan jha. 2 from the house of manoj chaudhari to sunil singh house.
Repair and Overhauling Service - Brush cutter, Pole pruner, mist blower, chain saw; Sthil; Yes; Buyer Premises
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Surf Board - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3)
GROUP NO.- 67 Name of Work :- Construction of PCC Road & RCC Drain from the house of Md. Mazhar infront of Dr. Zakir via Chakzohara Maszid to the house of Md. Izhar in Mohalla Chakzohara ward no-38.
GROUP NO.- 66 Name of Work :- Construction of PCC Road & RCC Drain from the house of Ganga purvey to the house of Amarnath Mallickin Mohalla-Belwaganj.(2)from Navin Farmecy to the house of Ajay Sahani in Mohalla Hospital Road ward no-36.
GROUP NO.- 36 Name of Work :- Construction of RCC Drain and Pcc road in ward no. 19 1. From house of mintu singh to house of gami jii via to main road.2.from the house of pankaj mehta to main road mirjapur road 3.from the house of ranjeet sah to main road.
GROUP NO.- 71 Name of Work :- Construction of RCC Drain and PCC Road From Bijli office to Lakshya Coaching centre house in Ward 42.
RO Plant with Genset and Trolley (Q3)
Potable Water Purification System DE-Ionization Based (Q3)
Waste Container (V3) (Q4)
Sanitary Napkins Vending Machines (Q3), Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sanitary Napkins Vending Machines (Q3), Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Waste Container (V3) (Q4)
GROUP NO.- 22 Name of Work :-BOQ of Four No. of Submersible Pump With water Supply through Stand post in each Ward with in Municipal Corporation area from ward No 45 - 48.
GROUP NO.- 76 Name of Work :- Construction of RCC Drain 1.in Gudri Bazaar from Abhishek Choudhary house to Jagarnath jha ji house 2.Paver block Road in Muhalla G.N Ganj in Ward 47.
GROUP NO.- 39 Name of Work :- Construction of PCC road in ward no. 21. 1. from the house of shrawan sah to mahajid.2.on the defrent place kabja of steel conect slab.
GROUP NO.- 38 Name of Work :- Construction of RCC Drain ,culvert and pcc road in ward no. 20 from the house of shri kamal shrivastav to the main road .
GROUP NO.- 31 Name of Work :- Construction of RCC Drain & PCC Road from Main road to Manoj yadav house at Sakmapul in Ward 18.
GROUP NO.- 16 Name of Work :- Construction of RCC Drain & PCC Road from Sri Vivekanand jha ji house to Anirudh thakur ji house in Ward 13.
GROUP NO.- 15 Name of Work :- Construction of PCC Road from Sri Madan mahaseth ji house to Rajendra jha house in Ward 13.
GROUP NO.- 10 Name of Work :- In Ward-09, (1) Construction of :- Drain and road from Ramchandra sahni home upto Ranjan ray home in muhallah Chunakhari and Manoj kumar sah home upto Shambhu Sah home in muhallah Ratnopatti.