Loading…
Loading…
9,209 results • Latest
Solar Light Installation from Chipchipe to Pakhrin Gaon, 4 KM Approx, Lepcha Busty, 25 Nos (Rangit-II GP).APAS/01/023/108/0001
Const. of Footstep from Rojesh House to MSK,
Construction of 3 nos. 132KV by 110V PT foundations and 3 nos. 132KV Isolator foundations alongwith a supporting structure at each of the 132 KV switchyard of Power Station I, II, III of Teesta Canal Fall Hydel Project.
Repair and Renovation of New Dormitory at Power Station I, Leusipukuri, Dist. Darjeeling.
Installation of Solar Light at upper Singbongdera, Lower Singbongera, Upper Arubotay, Lower Arubotay, Gairi Gaon, Total-25 Nos (Mazuwa GP).APAS/01/023/38/0001
Refurbishment of store godown access road and construction of roadside drain within the premises of Power Station II of TCFHP at Haptiagachh in the District of Uttar Dinajpur.