Loading…
Loading…
8,987 results • Latest
Repairing Potholes and Damaged surface of Kharibari - Phansidewa Road to Chaterhat with a link to Bajuriagoach B.O.P road from 0.00km to 0.600km, 0.700km to 1.100km, 1.20km to 1.40km, 1.50km to 2.100km and 2.30km to 2.80km (in stretches) in the Distr
Maintenance of water supply pipe from Siseney Jhora to Bar pipal and maintenance of Tank also
Matigara - Kurseong Road from chainage 11.00 kmp to 15.00 kmp (in stretches) Surfacing work by Mastic Asphalt, Protective and allied work under Darjeeling Highway Division in the district of Darjeeling.
INSTALLATION OF SOLAR STREET LIGHT COVERING CHOTA TINGLING VILLAGE UNDER BOOTH NO 24/160 UNDER SOURENI II GP UNDER MIRIK DEVELOPMENT BLOCK APAS
Construction of CC Road from Mohan House to Stephen House at Gairi Gaon PS 271
Processer i5, Motherboard HP, RAM DDR4 8GB, DVD Writer Mini, Logic Card, Motherboard 510, RAM DDR3 8GB