Loading…
Loading…
122 results • Latest
Annual Maintenance of Hospet to Shimoga SH-25 Road from 104.85 to113.675, 115.00 to 116.50, 119.10 to 122.535, 122.625 to 122.90, 123.77 to 123.98 , 125.611 to 125.99, 127.819 to 128.00, 132.00 to 134.928 and 137.50 to 142.83 and (SH-76) Birur Sammasagi Road via Ajjampura, Sivani, Channagiri, Santhebennur, Davangere, Harihara, Koda and Thilavalli Ch 121.75 to 122.59 and Loop Road in Harihara Town via HariharaCourt (SH-76L) from Ch 0.00 to 2.52 in Harihar taluk
Construction of CC drain in Lokikere road Shrishaila petrol bunk opp Ravindranath nagar siddeshwar badavane K G Nagaraj house to R Tippeshappa house in ward no.41(SC)
Construction of c c drain in 1st,3rd and various cross roads saraswathi badavane at ward no 33(CAT IIA)
Construction of CC drain with covering slab in 1st main infront Durgambika temple Hale chikkanahalli Haralayya nagar in ward no.30
Development of UGD at Ward no.39 Vidyanagar Main roadCATIIA
Providing and Fixing decorative electric poles and development work in the park near 10th Main 14th Cross, Siddaveerappa Layout, Davanagere City.
Providing and Fixing high mast light in front of Mylaralingeshwara temple Shibara road in Davanagere city.
Providing and Fixing 3 high mast lights in the parks of Rajiv Gandhi Layout, Davanagere City, which is part of the Master Plan.
Providing and Fixing street lights from Hadadi Road to near Jayadeva Circle in Davanagere city.
Providing and Fixing decorative electric lights from Ayub Masjid to Anjaneya Temple and near Ram Mandir in J.C. Layout, Harihar city, Davanagere Dist.