Loading…
Loading…
2,064 results • Latest
Construction of Gour Kothi Babu Tola link Road
RAILWAY TIRAHA SE BARHAJ BAZAR RAILWAY STATION HOTE HUYE RAILWAY CROSSING TAK RCC NALA V NALE PAR STAB NIRMAN KARY DAKSHIN SIDE
work 4 pipe line
Construction work of minor bridge, approach road and protection work on Khanua Nala in Village Bharouta of Block Tarkulwa in Dist Deoria
GRAM RAM NAGAR CHHOTI RAISHRI PANCHAYAT BHAWAN SE AJAY DRIVER KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM BARHARA ME YOGENDRA PRAJAPATI KE GHAR SE RANVEER MISHRA KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM VISHUNPUR BAGAHI PWD SADAK SE KALI MANDIR HOTE HUE PRADHAN KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM PIDARA PWD SADAK SE BECHAN CHAURASIYA KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM GAZIPUR BHAISAHI KE RAMSAKAL MAURYA KE GHAR SE CC SADAK PULIYA KE PASS TAK SADAK NIRMAN KARYA
GRAM NARAYANPUR BANDHA SADAK PWD SADAK SE RAJENDRA BARI KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM INDUPUR JOGAM PITCH MARG SE KARMBIR SINGH SOLANKI KE GHAR TAK CC SADAK NIRMAN KARYA
GRAM BAKHARA KE POKHARA TOLA SE HARENDRA GAUTAM KE GHAR TAK CC SADAK NIRMAN KARYA
WARD NO.28 ME BRAHMA STHAN SE MUNNA MISHRA , RAJESH MANI KE GHAR HOTE HUYE MAIN PICH ROAD TAK C.C. ROAD V NALI NIRMAN KARYA
Renewal work of Baluwa link Road
WARD NO.26 ME MOTILAL COMPLEX SE AKASH MADDHESHIYA KE DUKAN TAK C.C.ROAD V DONO TARAF COVERD R.C.C.NALI NIRMAN KARYA
Work of widening and strengthening of Pakdi Kukurghati Road (ODR) (Length 9.200 Km) in district Deoria
Estimate for pipe line extension work at ward 2 Nagar Panchayat Gauribazar
Ward no 03 Gupta Tea Stall se masjid hote huye harijan basti ke kone tak cc road nirman karya
Facility Management Services - LumpSum Based - Healthcare; Water tank mechanical cleaning and disinfection; Consumables to be provided by service provider (inclusive in contract cost)
Renewal of Deoria hata se Baliyawa se Goura samapark marg
GSM Alert system (4G) with Web/Mobile for escalators
Renewal of Salempur lar Km 7 to Bourdih link road
Special repair work for Pooled Housing Type-1(T) units No. 61 to 72, located on Motilal Road in District Deoria.
Special repair works for residential units No. 09, 10, 19, and 20 of the Pooled Housing Complex (Type-2D), situated on Motilal Road in District Deoria.
Special repair work for Pooled Housing Type-1(T) units No. 01 to 12, located on Motilal Road in District Deoria.
deoria gorakhpur mukhya marg sher singh ghar se kalika singh ke makan hote hue ravi rajbhar ke ghar ki or mitti khranja
pipra bhaghel uttar patti transfarmar cc road se cc tak cc karya
gram sabha pipra baghel uttar patti me bhisma singh school se daddan singh ke ghar ki or cc karya
khorahwa dube me men pich marg se sumit ke khet tak cc karya
gram sabha mahuadeeh deoria hata mukhya marg se interloking ke aage se nahar pich marg tak lepan karya
gram sabha pariyapar padauli chaurahe se jaisawali mor puliya tak nali
gram chakarwa tola prathmik vidyalay se dhudha train ttak nali nirman
gram sabha banjariya me gaon ke purab sri sashank srivastava ji ke ghar ke aage se shrma singh ke school ke samip nale tak nali
gram sabha dharmer mahaliya me premchandra kushawa ke ghar baha tak nali ewam dhakkan nirman
gram sabha sahala me pich road se sudama yadav ke ghar hote hue bhupendra ke ghar tak cc
gram kheriya me babulal ke ghar se kurna nala ki or nali nirman
gram sabha barka gaon pokhari tola se garahi tak nali nirman karya
gram sabha bhera pakar me pich se shiv ji shrma ke ghar tak cc
EOI FOR ROAD TRANSPORTATION OF BULK PETROLEUM PRODUCTS MS/HSD/Branded Fuels BY BOTTOM LOADING TANK TRUCKS FOR Dealers/ Consumers Ex Baitalpur Depot
Widening and strengthening work of Bhathat Pipraich road ODR in dist kushinagar
Widening and Strengthening work of Bhaluani Rudrapur via Pakadi Road (ODR) ch 0.000 to 17.350 in district Deoria (Length 16-700 km)
Renewal of Rajswa gram Gopalpur se Gopalpur Sampark Marg
Estimate for pipe line extension construction of pumping plant based on soler work at Bauli ward phase01 work in Nagar Panchayat Lar Deoria.
Estimate for Pipe line extension at ward no 13 Math ward work in Nagar Panchayat Lar Deoria .
Estimate for Pipe extension at ward no 05 Gayagir ward work in Nagar Panchayat Lar Deoria.
Special repair works for the building housing the Office of the Executive Engineer, Construction Division, Public Works Department (PWD), Deoria.
FLOOD PROTECTION WORK BETWEEN KM 15.800 TO KM 16.000 OF TIGHARA MARACHI BUND NEAR VILLAGE EKAUNA ON THE L/B OF THE RAPTI RIVER IN DISTRICT-DEORIA
ANTI EROSION WORK BETWEEN KM. 0.825 TO 1.140 OF CHHITTUPUR BHAGALPUR BUND ON L/B OF RIVER SARYU (GHAGHRA) IN DIST. DEORIA
ANTI EROSION WORK BETWEEN KM. 7.100 TO 7.500 OF JIRASO BADKAGAON BUND NEAR VILL. BHAWAN TOLA ON L/B OF LITTLE GANDAK RIVER IN TEHSIL BHATPAR RANI OF DIST. DEORIA
FLOOD PROTECTION WORK BETWEEN KM 6.340 TO KM 6.790 OF NAGAWA CHAPARA BUND NEAR VILLAGE DADHIYA ON THE L/B OF THE RAPTI RIVER IN DISTRICT-DEORIA