Loading…
Loading…
810 results • Latest
Disconnecting existing electrical wiring, dismantling of PV modules and module mounting structures, shifting of the existing rooftop grid-connected Solar PV Power Plant, reinstallation of the module and mounting structure
Fabrication/Repair of Top Cover of Bearing Housing, Aluminium Cooling Fans, and CI End Covers for 5m3 Main Pump M and P make, 200 KW Compressor Motors KG-8 Motors and 110KW/150KW Motors
Fabrication/Repair of Top Cover of Bearing Housing, Aluminium Cooling Fans, and CI End Covers for 5m3 Main Pump M and P make, 200 KW Compressor Motors KG-8 Motors and 110KW/150KW Motors
Removal and cleaning of loose and jammed coal lumps, fines etc spilled F/B and belt conveyor accumulated and around conveyor structure of F/B at Kessurgarh under ABOCP Mine of Block-II Area
Removal and cleaning of loose and jammed coal lums fines etc. 1.) Feeder Breaker No 1 (18mtr X 1.9 X 0.85mtr) + (18 X 1.85 X 0.84Mtr)= 57.04 M3 2.) Feeder Breaker No 2 (18mtr X 1.9 X 0.83mtr) + (18 X 1.85 X 0.70Mtr)= 51.69 M3
Repairing of 11KV Andrew Yule Make VCB Breaker Sr. No. 3848 along with cable work at Madhuban DG Substation under Block-II Area
Dismantling of 11Kv VCB from panel
Repairing of house wiring of Qtr no- B-179 and B-191 at Harina Township of Block-II Area
Wiring for light point/fan point/exhaust fan point/call bell point with 1.5sqmm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit with piano type switch, phenol laminated sheet, suitable size M.S. box and earthing the point with 1.5 sqmm FRLS PVC insulated copper conductor single core cable as required. (Group A)
Complete repairing and Rewinding of 500KVA 11KV/440V Transformer installed at Sector-2, Dugdha Township under Block II Area
New electrolytic copper strip for primary side 03 limb X 70Kg = 210Kg