Loading…
Loading…
531 results • Recent activity
MMPPNA_RIDF_XXXI_25_26_322 Construction of Road from (1) No 1 Hatiyamora towards Naharani Path from Ch. 0.00 m to Ch. 1590.00 m (L-1.590 KM) (2) NH 15 to Dighpukhuri via Haribor Doloni from Ch. 0.00 m to Ch. 1490.00 m (L-1.490 KM) under Mukhya Mantr
Improvement of Gogamukh to Ghilamara Road (SH-22) by providing 100 M Length Causeway at Ch. 19875 M under SDMF for the year 2023-24 in Lakhimpur District.
Improvement of road from NH15 at Uttar Kulabali to Boginodi Lalpani Road (from Ch. 800.00M to Ch. 2500.00M) by Cell Filled Concrete Technology under SDMF for the year 2023-24 in Lakhimpur District.
Plastic Fiber Glass Sheets
RUBBER HOSE RADIATOR TO THERMOSTAT, TARPAULIN ASSY CANOPY, ALTERNATOR 12 V 55 AMP, STRAINER FUEL, ASSY REAR VIEW MIRROR OUTSIDE RH LUMA, FRONT DIRECTION INDICATOR LH, CHAIN SILENT PT NO 3668270A, ASSY CLUTCH MASTER CYLINDER, FUEL WATER SEPRATOR, FILTER CARTRIDGE, RETURN FILTER, INDICATOR OIL LEVEL, TAPERED ROLLER BEARING 0750117816, LEVER ASSY PARKING BRAKE, LINK ASSY WIPER, OIL PRESSURE GAUGE, BRG CON ROD UPPER STANDARD, FILTER CUM WATER SEPARATOR, LEVER MANUAL CONTROL, DIRECTION INDICATOR, MAJOR KIT STARTER MOTOR 12V CONSISTING O, FIELD COIL ASSY, FRONT WIND SHIELD RH, LEAF 8TH, LINK ROD 224 LONG, MOTORISED HEAD LAMP RH AUTOLITE, RECTIFIER, RELAY WITH RESISTER 24V, REPAIR KIT MSP 365, RUBBER BELLOWDUST BOOT
Temperature Controlling Unit (1 Ton 3 Star)