Loading…
Loading…
172 results • Latest
Internal Electrification, Pump Panel and Pump-Motor Installation for Proposed 21 TPD Municipal Fresh Waste Processing Plant under SWM Project (including Office, Weigh Bridge and Security Rooms), Dakshin Dinajpur Gangarampur Municipality.
PROVIDING OF SEPARATE TOILET FACILITIES AT 07 NOS OP POINTS FOR MAHILA PRAHARIES IN AOR OF 57 BN BSF UNDER SHQ BSF RAIGANJ HQ NB FTR BSF (SH ELECTRICAL INSTALLATION)
PROVIDING OF SEPARATE TOILET FACILITIES AT 05 NOS OP POINTS FOR MAHILA PRAHARIES IN AOR OF 123 BN BSF UNDER SHQ BSF RAIGANJ HQ NB FTR BSF (SH ELECTRICAL INSTALLATION)
PROVIDING OF SEPARATE TOILET FACILITIES AT 05 NOS OP POINTS FOR MAHILA PRAHARIES IN AOR OF 29 BN BSF UNDER SHQ BSF RAIGANJ HQ NB FTR BSF (SH ELECTRICAL INSTALLATION)
PROVIDING OF SEPARATE TOILET FACILITIES AT 05 NOS OP POINTS FOR MAHILA PRAHARIES IN AOR OF 91 BN BSF UNDER SHQ BSF RAIGANJ HQ NB FTR BSF (SH ELECTRICAL INSTALLATION)
PROVIDING OF SEPARATE TOILET FACILITIES AT 05 NOS OP POINTS FOR MAHILA PRAHARIES IN AOR OF 79 BN BSF UNDER SHQ BSF RAIGANJ HQ NB FTR BSF (SH ELECTRICAL INSTALLATION)
Repair work in stretches of Balgona - Guskona - Mankor Road(SH-14) with premix and Seal Coat from 36.50 km to 39.00 kmp under Asansol Division, PWD, in the district of Paschim Bardhaman during the year 2026-2027.
Patch repair work of Dhobaru Ranisayar Bas stand to Mugraboni Adibasi para Bus stand Road with Potholes, Premix and Seal Coat from 0.00 kmp to 2.90 kmp in stretches under Asansol Division, PWD, in the district of Paschim Bardhaman during the year of
Patch repairing work in stretches of Rajkusum - Kuldiha More Road with Potholes, Premix and Seal Coat from 3.00 kmp to 8.75 kmp in stretches under Asansol Division, PWD, in the district of Paschim Bardhaman ., during the year of 2026-2027.
100 Off Grid Solar Power System for operation of Solar Submersible Pump fans lights etc complete in all respects as detailed in Annexure I