Loading…
Loading…
160 results • Latest
supply of Quizalofop Ethyl 10 ten percent e c
supply of Captan seventy percent plus hexaconazol five percent wp
supply of chelated zinc zn twelve percent
supply of metalaxyl eight percent plus mancozeb sixty four percent wp
supply of Ammonium Molybdate Mo 52 fifty two percent
supply of disodium octaborate tetrahydrate B 20 twenty percent
Supply of Emamectin Benzoate five percent SG
Post monsoon patch repair work in stretches of Balgona - Guskona - Mankor Road(SH-14) with potholes, premix and Seal Coat from 39.500 kmp to 42.50 kmp in stretches under Asansol Division, PWD, in the district of Paschim Bardhaman during the year 2026
Andal Station (MDR)Post Monsoon patch repairing work in stretches by Potholes, Premix and Seal Coat from Ch. 0.0 Kmp to 1.80 kmp and raising of road surface by WBM from Ch. 0.80 to 0.90 kmp under Durgapur Sub-Division of Asansol Division, PWD, in the
Post monsoon patch repair work in stretches of Balgona - Guskona - Mankor Road(SH-14) with potholes, premix and Seal Coat from 33.20 kmp to 36.20 kmp in stretches under Asansol Division, PWD, in the district of Paschim Bardhaman during the year 2026