Loading…
Loading…
3,421 results • Latest
REPAIR TO PCC ROAD AND RE-SURFACING OF BITUMINIOUS ROAD, POTHOLES AT KISHTWAR, BHANDARKOT AND DUL AREA UNDER AGE (I) BHALRA
As per Nit
Construction of Flood Protection Works in Doda East Constituency at various spots falling under the jurisdiction of IFC Division Doda Phase-I
Construction of Road from Km 2nd of Bhatyas Manoo Road to Polie via Papri Aab Phase-1st under UT Road Sector (New Works) Capex Budget 2026-27.
Construction of Road from Dhadkai to Bhatogra via Upper Bathri and Kamo Phase-1st under UT Road Sector Capex Budget 2026-27.
Providing laying and fitting of HDEP Pipe from Khajrala to Thatha for irrigation Purpose Rd(0-1500) m.(M.H 4702) UT Capex.
Restoration and Improvement of Ghat Khul Rd 1550-1900 mtr and 2400-2500 mtr at spots and Distributary No.01 Rd 0-150 mtr at spots Phase-01. (M.H 4702) UT Capex.
Improvement of Jangalwar khul from Rd 1250 mtr and Rd1450-2700mtr. (M.H 4702) UT Capex.
Kalbanglo Khul -Improvement of Khul from RD 0-2200 Mtrs at spots and construction of Distributory No. 1 from NH Chamba Road to University Campus Bhaderwah.
Chirote Khul -Improvement of Khul from RD 0-2200 Mtrs at spots and Construction of Distributaries.
Upgradation of link road Rewara to Kotri Phase-I (Under UT Road Sector (New work) Capex Budget 2026-27)
Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report Getting it vetted from DIQC NIT IIT for 16 No of missing bridges PIU Doda
SPECIAL REPAIR OF BITUMINIOUS ROAD FROM HELIPAD TO COOK HOUSE (480 MTR LONG AND 03 MTR WIDE) AND JCO MESS TO MT PARK (130 MTR LONG AND 03 MTR WIDE) UNDER AGE (I) BHALRA
Vehicle Towing
Creation of 25 KVA DT at Chapra Pyt Dharra , LT poles at Block Udyanpur , under CDF and LT poles at PYT Hanga Bhaderwah, Pyt Mothi B and Marmat area, Pyt Kari Bhalla, Shiva Mandir Chiralla under untied in the juridiction of ED Doda
PROVISION OF ACS AND UNDERGROUND CABLING AT CERTAIN LOCS UNDER AGE (I) BHALRA
Constt of Yatri Shed at Dhansal in Pyt Kuthyara Block Assar (CDF)
Constt of P Path NHO Lehar Singh at Lower Shantra Bathi Ward no 01 Pyt Mallan A Block Bhagwah (CDF)
construction of veterinary Dispensary Thathri under NABARD DAHJ
Constt of P Path NHO Santok Singh and Surjeet Singh and other community level at Lower Shantra Bathi ward No 06 Pyt Mallan A Block Bhagwah (CDF)
Constt of Lane Drain near house of Champa Thakur W no 05 Pyt Kotli Block Kastigarh (CDF)
Constt of R Wall at Barsal near house of Kalyan Singh Pyt Kotli Block Kastigarh (CDF)
Constt of GI Chain Link Fabric Fencing at Fish Pond Chanka W.no 02 Pyt Dhandal B Block Kastigarh (CDF)
Constt of Toilet complex at baguri Pyt Mundhar Lower A Block Kastigarh (CDF)
Constt. of P/work NLO Sharifa Begum at Kamra Shuryan Pyt Birshalla Block Ghat (PRIs Grant) 2nd Call
Repair and Renovation of Bath Room with Tiles Jamia Masjid Khonu ward No 5 Pyt Bagla Block Dali udhyanpur (PRIs Grant)
Constt of P/path at Shukra W No 2 Pyt Batara Block Bhallessa (PRIs Grant
P/path Fmr towards Jamia Masjid Lower Bharowah ward 06 Pyt Diggi Block Bhaderwah (PRIs Grant)
Construction of Cremation Platform/Shed Ward 1 Pyt Gutassa Block Bhaderwah (PRIs Grant)
Tile Work NHO bansi Lal, Jia Lal and Baby Devi Ward 7 Pyt Gutassa Block Bhaderwah (PRIs Grant)
Fencing of Pond at Lachranshar Ward 6 Pyt Gutassa Block Bhaderwah (PRIs Grant)
Constt. Water Tanki Upper Manghan Mohalla Ward 6 Pyt Gutassa Block Bhaderwah (PRIs Grant)
Tile Work Rasoli Mohalla Pyt Gutassa Block Bhaderwah (PRIs Grant)
Tile Work Chanti Mohalla Ward 3 Pyt Gutassa Block Bhaderwah (PRIs Grant)
Tile Work at Khara/Pera Mohalla Ward 2 Pyt Gutassa Block Bhaderwah (PRIs Grant)
PROVISION OF 200 KVA TRANSFORMER UNDER AGE (I) BHALRA
REPAIR/ REPLACEMENT AND MAINTENANCE OF EXTERNAL ELECTRIC SUPPLY WORKS AND MISC CONNECTED ITEMS AT CERTAIN LOCATIONS UNDER AGE (I) BHALRA
CERTAIN REPAIR/ MAINT OF SEWAGE LINE, SEPTIC TANK, SOAKAGE WELL, DRAINS, PATHWAYS, HARD STANDING, FENCING, COMPOUND WALL, RETAINING WALL AND OTHER MISC WORKS AT DHARMUND UNDER AGE (I) BHALRA
Financial Audit Services - Review of Financial Statements, Financial Reporting Framework, Audit report, verification of e-SAKSHI Portal; Audit Firm, CA Firm, CAG Empaneled Audit or CA Firm
Repair of Top Enclosure, Repair of Bottom Enclosure, Repair of Landing Gear Assembly, Repair of Landing Gear Mount Clamp, Repair of Propeller Assembly CCW, Repair of Propeller Assembly CW, Service Charges, Consumables
RESURF WKS WITH BC 30 MM WITH CORRN WK BM 50 MM THICK, RD MARKING TP PAINT 2.5 MM THICK , FIXNG CAT EYES BET KM 0.00 TO KM 10.40 ON KAPRA-BHALRA-BALOT-CHINTA RD AND BET KM 1.300 TO KM 2.300 ON ARNORA-LINK RD (TOTAL-11.130 KM CL-9) IN 118 RCC/SAMPARK
Tile work FHO Ali Mohd. To Barkat House ward 06 Pyt Katyara Block Bhaderwah (PRIs Grant) 4th Call
constt of p/path from HO Ab latief to Thoteel Ward No. 03 Pyt Gadi B Block Bhagwah (PRIs Grant) 4th Call