Loading…
Loading…
1,320 results • Recent activity
Supply and Installation of Nd-Yag Q-switched pulsed laser at IIT Bhilai
Electric Motorized Treadmill (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6836496 Dated : 29-10-2025 Bid Document 1/11 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
M1616466552 PIPE: IS3589-GR. FE410200NB/219.1 OD8.00MM, M1616466491 PIPEIS3589-GR. FE410: 200NB/219.1 OD6.30MM
Head Stock for LHB Coaches as per Drawing No LE11165 Alt g Note: For Top Flanges i.e. Item No 6 & 31 of Drg No LE11165 Alt g drawing nos LE11284 Alt g & LE11285 Alt h are to be used respectively Make
Horticulture Service - Lumpsum based - Nursery Infrastructure like Shade Net House Poly House Mist Chamber Hardening Chamber; Propagation of Horticultural Crops
PUMP, SP 71 SR-V-EP-R90-2437761, BOSCH, AXIAL PISTON, SP 180-SR-V-EP2435703, SEALING RING KIT, PN: WDRA4CSG-71-S1111H