Loading…
Loading…
1,001 results • Latest
Doubling of track between TURAVUR - MARARIKULAM (TUVR - MAKM) section:- Proposed earth work in formation, modification of LCs, provision of S&T accommodation and Gate Lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of FOBs, protective works, proposed extension of Minor bridges, between Turavur (Excluding) and Cherthala (Excluding) stations (KM 24/000- KM 32/100) (TUVR-SRTL Reach)
Annual Rate Contract for Transportation of Bamboo Boards, Bamboo Flooring, Bamboo Products and Allied Materials from KSBC Production Units to Various Destinations within Kerala on Rate per Kilometre Basis.
supply of Garden implements
Supply of Grow bags HDPE Containers
Transportation contract for supply of seeds, seedlings, fruit plants, growbags
Supply of two layered pouches and rolls
supply of hybrid seeds, OP seeds
Supply of ornamental plants
Doubling of track between Turavur - Mararikulam (TUVR - MAKM) section:- Proposed earth work in formation, modification of LCs, provision of S&T accommodation and gate lodges, provision of cable ducts, side drains, retaining walls, construction of platforms, construction of FOBs, provision of Platform Shelters, protective works, proposed extension of Minor bridges along with P.Way Works at Cherthala Yard (KM 32/100-KM 34/300) (length = 2200 m) and Mararikulam Yard (KM 43/300-KM 45/100) (length = 1800 m)