Loading…
Loading…
619 results • Latest
Construction of Interlocking Road in Rajaram Memorial Higher Secondary School At Nagla Asroi, Disst. Etawah
In Muhalla ludhpura Drain repairing work and CT PT repairing etc
In Ward 16 Amar singh to hakim singh house interlocking road and drain work
ENT CONSUMABLES
Customized AMC/CMC for Pre-owned Products - Repairing and Troubleshooting of Existing CCTV Surveillance System; - -; Annual Maintenance Contract (AMC); Quarterly; Yes
Manpower Outsourcing Services - Fixed Remuneration - Admin; Administrative Operator or Office Assistant or Executive Assistant; Graduate
Construction work of RCC box culvert and its approach road on the route from village Chaurela to Jakhaita, originating from Bithauli-Chaurela road
Air Break Contactors (Q3)
Renewal work along with general repair
Renewal work along with general repair
Renewal work along with general repair
Renewal work along with general repair
Hose Pipe, 63mm Dia, 15 Mtr For Fire Hydrant System ( 12 Unit ), GI Nut Bolts For Clamp/Connectors ( 112 Unit )
Vaivaha se choupla rajwaha patari marg ka shesh bhag par Tharmoplastic paint dwara road marking ka karya
Pole Mounted Stainless Steel Dustbin (V2) (Q3)
Operation And Maintenance Of Substation - CARRIAGE & LAYING OF POWER CABLE INCLUDING OTHER ASSOSIATED WORKS
Eco-tourism development work in Sumer Singh Fort area of Etawah district.
Tourism development work of Gautam Buddha Park near Exhibition Ground in Etawah Sadar Block of Etawah district.
Silicone Grease as per IS 508 (Q3)
Auction of Silt/soil work from Km 86.700 to Km 88.000 of Bhognipur branch
Silica Gel (V2) Conforming to IS 3401 (Q3) (3 (3 ))
Auction of Silt/Soil from Km 112.678 to 113.458 (Lakhna Bridge) Old of Bhognipur Branch
New construction work of Kanyachi link road falling under Chakarnagar development block of Etawah district
Substation Clamps/Connectors (Q3)
Repairing of link road vasak rajvaha to hidupur
Janpad Etawah Kachchari me Advocate avm Aam Janta Bethne hetu Sarvjanik Veramdah Nirman Karya
Work of establishing Sarus Circuit under Sarasai Nawar and Parauli Ramayana of Etawah district.
Cast Iron Bench (Q3)
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis in Business Plan 2026-27 under the area of Electricity Distribution Division, Saifai Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Maintenance and Tightening of Ground Base Towers under Operational Area-Etawah during FY-2025-26 (Phase-I) (Actual to be executed in FY2026-27)
Custom Bid for Services - Installation of New 250 KVA Distribution Transformers in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Distribution Circle, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Installation of New 16 KVA, 63 KVA and 100 KVA Distribution Transformers in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Distribution Circle, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis under EUDD Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Renewal work along with general repair
DO SUTI KAPDE KA BAG (04 K. G. ) CAPACITY
DO SUTI KAPDE KA BAG (01 K. G. ) CAPACITY
Tourism development work of Shri Hanuman Ji Temple Sehud Dham situated under Auraiya Assembly Constituency.
Maintenance of Chanethi drain from Km. 0.000 to 6.400
Maintenance of Malhausi drain from Km. 0.000 to 6.740
Maintenance of Deo Sarai drain from Km. 0.000 to 12.000
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Construction of office building and residential quarters for SIB Etawah (U.P.) (SH: Structural analysis and preparation of structural drawing of the building i/c plumbing, sewerage system, water supply drawings as per architectural drawings). Subwork/Packages: Civil Work
DESILTING OF JAGSORA DRAIN FROM KM 0.000 TO 2.600 and km 3.200 to km 5.000
DESILTING OF TIJORA DRAIN FROM KM 2.500 TO KM. 5.000 AND KM 5.400 TO KM. 7.000
Gold Purity Testing Meter/Karat Meter (V2) (Q3)
Gold Purity Testing Meter/Karat Meter (V2) (Q3)
Gold Purity Testing Meter/Karat Meter (V2) (Q3)
Gold Purity Testing Meter/Karat Meter (V2) (Q3)
HDPE life boat for rescue (8 SEATER) as per GSDRF specification (Q3) (3 (3 ))
Repairing of link road Karri sarsai helu marg to shadipur