Loading…
Loading…
95 results • Latest
Erection and installation of 63MVA T/F alongwith strengthening of 132KV Bus Bar from Single Moose to Twin Moose and splitting of 33 KV Bus at 132KV Sub-Station Khaga, under Electy. Trans. Division-Fatehpur
Supply of 420KV SIEMENS make Spare CB with Operating
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
PVC Insulated (Heavy Duty) Electric Cables Marked To IS 1554 (Part 1) (V2) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
52kV, 3150A RIP Bushing with metal parts and Gaskets as per POWERGRID TS for NER, 52kV 3150 A RIP or RIS Bushing solid Stem with Metal Parts and Gasket for NR-III, 52 KV 3150 A LV RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-I, 52 KV 3150 A RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-II, 52kV 3150A, RIP or RIS Bushing Solid stem With Metal Parts And Gaskets for NR-II, 3150 Amps RIP or RIS bushing Solid stem type with metal part and gasket for Odisha, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for WR-I, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for ER-I