Loading…
Loading…
85 results • Latest
Construction of R wall with fencing of graveyard near Spring at Kurhama-A Block Wakura PRI 759
Engagement of labour for clearance of site
Construction of bathroom near Jamia Masjid at Kachpatri Hariganiwan Block Gund CDF
Earthwork in bulk excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils
Construction of p wall from Tariq to H/o Mohd Ashraf at Kachpatri at Hariganiwan-A Block Gund CDF
Earthwork in bulk excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils
Construction of footpath with drain from Masjid to Gulsheer at Mir Mohalla Kachpatri at Hariganiwan-A Block Gund CDF
Earthwork in bulk excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils
Construction of latrine/Bathroom near H/O Farooq ahmad and others at Gujjarpati Cherwan A .Block Kangan.CDF
Earthwork in excavation by mechenical means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil)
Fencing of PHC Batwina at Block Wakura CDF
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50m lead as per the direcyions of EIC : in cement mortar 60%quantity serviceable