Loading…
Loading…
392 results • Latest
PWD Sheragada to Ramakrishnapur Road Asset_Road_Retaining Wall_0.000 to 0.100
PWD road to Badachakada via Tarinipalli road Asset_Road_C.C overlaying_2.300 to 2.528
Repair to Bridge over Sulia Nallah at 8.50km on Harina Podamari under BSY Asset_Road_Vent Cleaning, Repairing of Railing and post, Revetment and Painting_Right Approach 0.000 to 0.050 Left Approach 0.000 to 0.050
Krishnapur - Khududi road_Road_SDBC, Jungle Clearance, Shoulder correction_0.000 to 1.700
PS road Sindhaba to Shyamsundarpurapalli Road Asset_Road_Pot hole repair and SDBC_0.000 to 2.800
Repair to Bridge over Routray Nallah at 4.050 Km on Chanameri Nuasahi under BSY Asset_Road_Vent Cleaning, Repairing of Railing and post, and Painting_Left Approach 0.000 to 0.150