Loading…
Loading…
90 results • Latest
Construction of an overhead water tank in Ward No. 21, pipeline installation work, and provision of household water connections and associated tap-water infrastructure for 200 homes.
1.SA Divn: CTR(S) 60kg -22.631 km and CTR(S) 52kg 0.5km on loop lines & TRR(S) 60kg - 5.146km on loop lines various yards. ( Flash butt weld items /LAW 1262/24- 25 ) 2. Proposal for Conversion of SWR into LWR 15.53 km. ( Flash butt weld items only/LAW 1248/24-25) 3. SA Div-Proposed through weld Renewal (TWR)- 11.5 km of AT welds into Flash Butt Weld in SA-KRR & SA-VRI sections
Potable Water Purification System DE-Ionization Based (Q3)
Potable Water Purification System DE-Ionization Based (Q3)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2026; 0-25, 00 kms; A/C; 12