Loading…
Loading…
Found 7 active tenders
7 results • Latest
Construction of ITI Boys Girls Hostel including furnitures for 10 Nos under Article 275(1) of the Constitution of India during the year 2024-25 (ITI, Dudhnoi, Goalpara)
12.24 Providing and fixing insulating board ceiling of approved quality with necessary nails etc. complete (frame work to be paid separately) : 12.24.1 Natural colour insulating board 12 mm thick
CONSTRUCTION OF D.N SINGHA STADIUM (PWSS) UNDER GOALPARA DIVISION UNDER SOPD-G FOR THE YEAR 2025-26
Installation of Deep Tube Well (Size-150mmx150mm) by Rotary Rig Boring 8.1.1. Preparation of site for placement of drilling rig, including excavation of mud pit etc circulation drain,collection chamber etc. all complete as directed.
Construction of R.C.C. Check Dam at Dhabanipara Goalpara under SOPD-G
RCC Check Dam
Establishment of 30 bedded CHC under Fifteenth Finance Health Grant scheme under NHM Assam Krishnai MPHC in Goalpara district FY 2024-25
Cost of Civil works
Deployment of maintenance team for maintenance of optic fibre cable network and upkeep of associated gears like AC, DG, Stabilizer, Change over unit, Shelter and Wi-Fi Equipments in Dudhnoi Section of RCIL/ER for a period of 2 years and extendable by
Conservation, Restoration and Rejuvenation works of the Mariampur Eco Tourism Lake of Goalpara district under Assam SWIFT Project
DE-SILTING & EXCAVATION: Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead from the beds of Beels/Tanks/ Ponds/ Swampy lands to the proper grade and slopes as required and utilizing the soil in construction of embankment or repairing of existing embankment on all sides, lifting in uniform layers not exceeding 20 cm thick (excluding compaction), clearing light jungles and trees up to 50 cm girth from the site of work, dug belling, profiling, ploughing or roughening or benching the seat, breaking clods up to 25 mm cube ramming, removing roots and vegetation, dressing to the designed section complete as directed. All kind of soil. Construction of Peripheral Bund with de-silted soil & Filling of low area near approach with de-silted soil