Loading…
Loading…
59 results • Latest
Construction of Paver block road including Protection wall at various locations under the ward no 06 UMC_UDP_2026_27. TL 150.00 m.
Construction of RCC drain with cover slab at different locations under ward No_06 UMC_UDP_2026_27. TL 150.45 m.
Construction of masonry Drain including cover slab from the various locations under the ward no 05 under UMC_UDP_2026_27. Total Length of Drain including cover slab 147.00 m.
Construction of Paver block road including Protection wall at various locations under the ward no 04 under UMC_UDP_2026_27. Total Length of P wall 150.00 m and Length of Paver block road 150.00 m.
Construction of RCC drain with cover slab and paver block road near house of Nityananda Banik at ward no 02 during the year 2025_26 UMC_UDP_2025_26 Total Length 81.90 m.
Development/Construction of RCC cover drain (L-150.00 Mtr.) for the road Baishyamani near Ampinagar H.S. School to Cremation ground under Ompi Block area Gomati Tripura during the year 2026-27/SH-Earthwork, RCC work, Protection work etc.
Development of road from Amarpur(Fatik Sagar) to Chabimura(Ch.3.20 km to 4.20 km) under Amarpur RD Block during the year 2026-27/SH- RCC drain, Grouting, PMC, sand seal coat and allied work etc.
Mtc. Work of Amarpur Sub-Jail, Amarpur Gomati Tripura during the year 2026-27.SH- Plastering,RCC work, PCC work ,Steel work,Wood Work etc.
Development of infrastructure facilities in Rural Market at Atharabhola and Kalaban under Gomati Tripura District SH Providing Internal Electrification