Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
634 results • Latest
Construction of boundary wall along with iron gate around the periphery of Birganj TK office building under Amarpur, Gomati District, Tripura
Construction of boundary wall along with iron gate around the periphery of Bampur TK office building under Amarpur, Gomati District, Tripura
Construction of boundary wall along with iron gate around the periphery of Amarpur TK office building under Amarpur, Gomati District, Tripura
Providing internal electrification at Govt. Ayurvedic Dispensaryat Jatanbari under RD Karbook Sub Division
CONSTRUCTION OF 2-BAY 4-VEHICLEs PROVISION FIRE STATION BUILDING AT KARBOOK UNDER RD AMARPUR DIVISION, GOMATI DISTRICT, TRIPURA DURING THE F.Y.2025-26
Providing internal electrification at Panchayet Bhaban at Purba Duluma and Purba Malbasa under Amarpur RD Block
Procurement and supply of 1st category Stone aggregate (Nominal size-20 mm /12.5 mm/10 mm) at various worksites under Matabari Kakraban Tepania Killa R D Block under Gomati District.
Supply of interlocking Paver block of different sizes for different construction work against various scheme within Matabari,Kakraba n,Killa,Tepania R.D Block under Udaipur R.D Division.
Renovation work at Kakraban Post office under Agartala Division (Electrical Works)
Development of Road from i) Lefunga via SB centre to Dakma(L 1.79km), ii) UK main road to Singaramura(L 1.92km)
Development of road from Jayanti bazar to Baskhet (Length 1.10km) under Matabari block, Gomati, Tripura
Development of Road from Udaipur Kakraban PWD road to Mill Chowmuhani ( H/O Akchir Miah) ch 0.00km to ch 0.40km
Development of road from Khamarbari to Jirkanta (L4.95Km) under killa block./S.H WBM in patches, grouting, Re-Carpeting, seal coat and allied works etc.
Development of road from Killa to Dakbari (T-I) from Ch 0.00 to 4.00 Km (L 4.00Km) under killa Block
Development of road from Garjee to Sukhnacherra (Length 1.00 km) under Matabari block, Gomati, Tripura
Development of road from Maharani Barrage road to Hirapur Canal (Length 0.30 km) under Matabari block, Gomati, Tripura
Development of Road from i)Udaipur Kakraban PWD road to Jamjuri Shalghara road via Gramin Bank (L1.20km) ii) Udaipur Kakraban PWD road to Jamjuri Murapara PWD road via Kajal Chowdhury house (L0.67Km)
Re-Construction of 1 (one) no. RCC Box Cell Bridge( Tripple Cell, 3 x 6.00 x 6.00 m) in the road from Dhuptali Bazar to Balarai Para (Ch.0.15 Km) under Kakraban RD Block during the year 2026-27
Upgradation of road from NH-08 (Near Sangeet Lahari) to back side of Chantai Dighi, Sangeet Lahari road, road from chanban shanitala (Gada Chowmuhani) to Gomati river side (Saw mill road)/
RCC drain, Brick soling, WBM, Carpeting and allied works from NH-8 (near Sonamura Chowmuhani) to Karunabazar under UMC Ward No.- 21 during the year 2026-27.
Upgradation of road from NH-08 (Near Sangeet Lahari) to back side of Chantai Dighi, Sangeet Lahari road, road from chanban shanitala (Gada Chowmuhani) to Gomati river side (Saw mill road)/Construction of RCC Cover drain from MG road to River side (Sa
Development of road from NH8 to Datarampara Holy Cross School (Length 1.100 km) under Matabari block, Gomati, Tripura
Mobile Containers For Solid Waste Conformingto IS12402 (Q3)
Supply, Installation, Testing And Commissioning of Transformer Online Moisture Removal System at ONGC Tripura Power Company Limited (OTPC) Palatana Plant, Tripura.
Const. DTW Schm undr PM-AJAY Schm/SH- Sinkng 01 No. DTW Schm wth Norml Power Rig, const. Pump House, layng distrbutn systm, instlltn Pump Motor at Chataria GP of TPN undr DWS SD-II. (Deposit fund)/ Sinkng of DTW.
Maintenance of different road under Tepania R.D Block during the year 2026-2027/ SH Tack coat, Carpetting , seal coat , grouting etc
Earth filling, GSB, WBM-II and III, BC, RCC cover drain etc. from Ch. 0.00 (near R.K. Pur P.O.) to Ch. 370.00m.
Earth filling, GSB, WBM-II and III, BC, RCC cover drain etc. from Ch. 370.00 to Ch. 920.00m.
Improvement of road and construction of RCC drainage system from Central road Shanitala to Mahadeb bari to Ramthakur Ashram road via Hariananda H.S. School including road from Ramthakur Ashram to Shanimandir (Central road) under UMC Ward No.- 6
Water Supply Schemes in Tripura under RWS/UWS/Re-Devalopment of 08(Eight) Nos old serviceable Deep Tube Wells with contractors own Normal Power Air Compressor and 08(Eight) Nos old Serviceable Deep Tube wells with Contractors Own High Power Air Compr
Execution of 15-Minute Drone Light Show with 500 Drones on the Inaugural Night (08/11/2026) of Diwali Mela 2026 at Matabari, Udaipur, Gomati District, Tripura
WSS at Jamjuri undr KBN RD Blck Gomati Distt, Tripura/Design, supply, cnstructn 1.20 MGD cpcty WTP in/c Civil, Mechncl, Electrcl wrks, supply all ncssry equpmnt, testng, succssful cmmissioning of plant etc. cmplt in all rspct undr JJM (Left out wrk).
UWS Schm undr Gomati Distt/SH- Provdng, Fittng Fixng of Electrcl Equpmnts, Accessores at 1.3 MGD SWTP Banduar, UDP under DWS SD No. I, UDP during the year 2026-27.
Augmntatn/Mtc diffrnt WSSs (RWS/UWS)/SH-Re-Dvlpmnt 13 nos.Old Serviceble DTW wth Cntractor Norml Powr Air Cmpressr in/c Lowerng, Lftng Pump motor in diffrnt Places undr jursdictn of Executive Engineer, DWS Divn, UDP, Gomati Distt, Tripura 2026-27.
Development of road from A-N Road to Santi Colony(L-2.234Km) under the Jurisdiction of Jatanbari PWD (RandB) sub-Division/SH-Throughout laying of 30mm thick Bituminous Concrete(BC) using VG-30 as tack coat along with other allied works during the
Mtc diffrnt DTW schm undr Palatana GP/SH- Repairng of leakage, washing of PVC, CI, DI, GI pipelines and extnsn of pipeline etc at dffrnt locatn wthn DWS SD KBN during the year 2025-26. (Deposit Work)
Development of road from Lowgang(Khumlongbari) to manai Para (Ch. 2.50 km to 4.90km) under the Jurisdiction of Jatanbari PWD (RandB) sub-Division/SH-Throughout laying of 30mm thick BC using VG-30 as tack coat along with other allied works during t
Restoration of DTW of Colony No 6/ SH- Providing Fitiing Fixing of GI Pipe, Restroration of FHTC etc at DTW at Colony No 6 at Chandrapur Colony G.P under Matabari Block during the year 2026-27. (Deposit Work)
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF KALYAN SAGAR BANK DEVELOPMENT INCLUDING ALLIED WORKS
FDR/Mtc of different roads in Ampi area under Ampi Sub-Division during the year 2026-27/SH-Grouting, Flat Brick Soling, Metalling, Re-Carpeting, Sand seal coat, Bats filling and allied works. Group-II.
Mtc. Of 0.65 MGD capacity SWTP at Kakraban under kakraban R.D Block /SH- Providing, suppling Alum, hydrated lime, bleaching powder, chlorine etc. at 0.65 MGD capacity of SWTP at kakraban during the year 2026-27. (2nd_Call)
Strengthening and Improvement of riding quality of road from Kakraban Motor Stand to Kukipara Galachipa via Mirza Bazar L 18.00 km under Gomati District, Tripura on Engineering, procurement Construction EPC mode
Construction of RCC boundary wall of ARDD Office Complex, at Udaipur under Gomati District/Group-IV
Construction of RCC boundary wall of ARDD Office Complex, at Udaipur under Gomati District/Group-III
Construction of RCC boundary wall of ARDD Office complex, at Udaipur under Gomati District/Group-II
Construction of RCC boundary wall of ARDD Office complex, at Udaipur under Gomati District/Group-I
Urgent post monsoon maintenance of different roads under Matabari Block, Udaipur Gomati, Tripura, during the year 2026-27
Mtc. Work of Amarpur Sub-Jail, Amarpur Gomati Tripura during the year 2026-27.SH- Plastering,RCC work, PCC work ,Steel work,Wood Work etc.
Development/Construction of RCC cover drain (L-150.00 Mtr.) for the road Baishyamani near Ampinagar H.S. School to Cremation ground under Ompi Block area Gomati Tripura during the year 2026-27/SH-Earthwork, RCC work, Protection work etc.
Development of road from i)Amarpur-Nutanbazar Road to Lichu Bagan Via Jahar Das house(L-0.428 km), ii) Cremation centre road to BSNL office via Tarun Chakraborty house and Cremation Centre Road(L-0.636 km)( Total Length- 1.064 km) under Amarpur Nagar