Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
104 live77 closing this weekmost from Department Of Panchayati Raj and RDD-CEO-GONDIA
104 results • Latest
Construction of Paver Block on Balaghat T Point- Jaistambh Chowk - Fulchur Naka Road MSH 11 (Gondia City Length) Tal.Dist. Gondia
Construction of CD Work (2 Row) on Bhagwattola Murri ROad SH 364 in KM 2/00 Tal.Dist. Gondia
Construction of CC Drain on Rawanwadi Kamtha Road SH 365 in Kamtha Village Tal.Dist. Gondia
Protection works to Bridge and Construction of CC Drain on Korni Kati Tedhwa Dhapewada Road MDR 03 KM 19/500 Tal. Dist. Gondia
Construction of CC Drain and CD Works on Tumkheda Khamari Dattora Gudma Road MDR 17 KM 0/00 to 4/500 Tal.Dist. Gondia
Construction of Protection Wall and Drain on khamari chulod temni barbaspura batana khatiya mogarra shirpur kochewahi wadegaon road MDR 61 (Newly Upgraded MDR) Tal.Dist. Gondia (near Pangoli River Batana Tola)
Protection Works to Bridge on Kamtha Chhipiya Banathar Satona Road MDR 12 KM 11/500 Tal.Dist. Gondia
Widening and Improvement and Construction of CC Road on Adasi Gudma Morwahi Irri Road MDR 43 in KM 3/600 to 5/200 Tal.Dist. Gondia
Construction of Cement Concrete Road and Internal Road at Deori
Construction of Gram Panchayat Bhawan at Chulod
TENDER FOR PROVISION OF SKILLED, SEMI-SKILLED, UNSKILLED, MANPOWER SERVICES TO WORK FOR NAGAR PANCHAYAT SADAK ARJUNI FOR THE YEAR 2026-27
RAISING AND STRENGTHNING OF WALL COMPOUND, CONSTRUCTION OF CC DRAIN IN THE PREMISES OF COURT, TIRORA TA. TIRORA DISTT. GONDIA
Leasing in of Commercial Properties - Office Space; Wet Lease (maintenance to be borne by lessor); 10 years- 15 years; 4; Ground Floor; Streetlights near the building, CCTV facility; yes; yes; yes; 195
Custom Bid for Services - Total Labour cost including EPF, ESIC & GST, Bonus for Mechanized coach cleaning at CAF and TMR Station, If any bidder quoted rates below from total labour cost (Including EPF ESIC Bonus and GST) his/her offer shall summaril.., Custom Bid for Services - Total Cost of Machine Tool Accessories Chemicals Consumables uniform etc for Internal and External Mechanized Cleaning of OEM Coaches at CAF and TMR Station including all taxes
PUMP CONTROLLER FOR SELF PRIMING MONO BLOCK PUMP ASSEMBLY OF LHB EOG COACHES
perchase of transport vehicle as per NIT
Solar Photovoltaic Water Pumping Systems (V2) asper MNRESpecification (Q3)
Solar Photovoltaic Water Pumping Systems (V2) asper MNRESpecification (Q3)
Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Savlon Solution Cetrimide 3 Percent w v and Chlorhexidine Gluconate 3 Percent w v 500 ml for No of Qty 50; Consumables to be provided by serv.., Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Bacillocide Solution Special 1point 6 Dihydroxy 2 5 Dioxohexane Glutaraldehyde Benzalkonium Chloride and Alkyl Urea Derivative 5 Litre Jar fo.., Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Barbour Linen Thread No 10 for No of Qty 10; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Liquid Hand Wash 500 ml for No of Qty 160; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Benzalconium Chloride Solution Saniquad P 500 ml for No of Qty 100; Consumables to be provided by service provider (inclusive in contract cos..
Facility Management Services - LumpSum Based - Public Health and Family Welfare Department GONDIA; Supply of Inj Heparine 25000 IU for no of qty 1000; Consumables to be provided by service provider (inclusive in contract cost)
Single Use Sterile Hypodermic Syringes for Human Use Conforming to IS 10258 (Part 1) (Q2), Over-Needle Peripheral Catheters (Intravascular Catheters - Sterile and Single Use) Conforming to IS/ISO 10555 (Part 5) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Nala Deepning at Kawditola Gat No 1/1 to 1/6 Taluka Goregaon, Dist.- Gondia
Nala Deepning at Soni Gat No 1/1 to 1/8 Taluka Goregaon, Dist.- Gondia
Nala Deepning at Girola Gat No- 1/8, 1/9, Halbitola Gat No-1/1, 1/2, Powaritola Gat No- 1/1, 1/2, Dagotola Gat No- 1/1, 1/2 Taluka Gondia, Dist.- Gondia
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat; Sabhapati chamber Room, 1. Wall Celling Grid siting 12' x 18', 2. PVC wall Pencilling 10 x 10, 3. Celling light 20 watt Qty – 4, 4. Celling Fan Qty - 3..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat; Upsabhapati chembar Rooom 1. Wall Celling Graid siting 12 by 18, 2. PVC wall Pencilling 10 by 10, 3. Celling Light Qty - 4, 4. Celling Fan Qty - 4., 5. E..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat; 1.Legal Digital scanner Qty - 1, 2. Office Table 2 by 4 Qty – 1, 3. Plastic Cooler Qty – 2; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat; 1.Office Non Revolving Chair Qty - 30, 2. Microtek Inverter 1200 watt 150 Ampiar. Battary Qty - 6, 3. Wall Fan Qty - 8; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat; Sabhapati room material 1. Cabin Rack 3 by 8 Qty - 1, 2. Sofa 5 by 2 Qty – 2, 3. Sofa 4 by 2 Qty – 2, 4. Window slide and curtain set Qty – 4; Service P..
Installation of Foundation Stone Landscaping and other allied works in the premises of pumphouse Under Dhapewada Lift Irrigation Scheme Stage II
Repairing works of doors windows and painting of Pump House under Dhapewada Lift Irrigation Scheme Stage I
Repair of the approach road from chainage 1320 m to 3200 m for the pump house under Dhapewada Lift Irrigation Scheme Stage I
Repairs to outlets and selective patches of main Canal under Dhapewada Lift Irrigation Scheme Stage I
REPAIRING WORK OF OUTLET AND SELECTED PATCHES OF R ON KAWALEWADA DISTRIBUTORY UNDER DHAPEWADA LIFT IRRIGATION SCHEME STAGE I
CONSTRUCTION OF HEAD REGULATOR AT 0 M ON RIGHT BANK MAIN CANAL OF BHADBHADYA MINOR PROJECT UNDER DHAPEWADA LIFT IRRIGATION SCHEME STAGE II