Loading…
Loading…
529 results • Latest
ARRANGEMENT OF MUG as Per Drawing No. ICF/SK-6-3-481. ALT-g, (Packing instruction-PI042).
WORK OF PROVIDING AND FIXING OF SMOKE DETECTION AND FIRE ALARM SYSTEM FOR PREVENTION OF FIRE HEZARDS AT 132 KV S/S ANAND NAGAR UNDER ETD-II, GORAKHPUR
Paint enamel synthetic exterior finishing black for railway coaches to IS : 8662/2024, RDSO amndt No. I (Rev. 0) for pigment content as an additional requirement to IS: 8662-2004 w.e.f. 01.08.2016 along with additional requirements of ICF/MD/SPEC-045 issue status: 02, Rev. no. 03, dated 14.06.2007 and RDSO s amndt. no. 1B Rev. 2.0 as an additional requirement, packed in 20 Ltrs. new and sound non-returnable M.S. drum to IS:2552/89 with amndt. 1 of April 1999, Grade B-1.
Drain cock assembly etc.
15 KVA UPS, 12 V 100 AH BATTERY, IRON RACK AND LINK
Diesel Power Generator (up to 900 KVA) (Q2) (3 (3 ))