Loading…
Loading…
5,826 results • Latest
B+Ve Cuffed Endotracheal Tube , Tube Size 6.5 mm , Pack of 10 Brand: B+Ve (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687766178844 dt.02/03/2026)
Safety strap for Axle box
Facility Management Services - LumpSum Based - Hospitality; Civil Wall Construction; Consumables to be provided by service provider (inclusive in contract cost)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Manpower Outsourcing Services - Fixed Remuneration - Admin; Computer Operator; Graduate, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; DRIVING LICENSE; Others, Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Procurement of IAC HT Motor
Construction of Interlocking Road From Manik Gupta House to Shri Gullu Pasi House in Gram Panchayat Bhagwanpur of Gida Area Sec 27 GIDA Gorakhpur
Construction of Road and Drain Near RSETI Sector 7 Building GIDA Gorakhpur Part 1
Provision for Extension and Raising of platform no.1&2 at Bilhaur station & Improvement of Bilhaur (BLU) station of IZN division.
(1) Improvement of PF 1&2 surface at MRT station in the jurisdiction of SSE/W/MRT. (2) Extension of PF-1 & 2 at MRT station of IZN division. (3) Raising of Medium level PF to High level PF at MHA, AUL & RKN stations under ADEN/MRT in IZN division.
Kanpur Anwerganj-Mathura Section:- Manufacturing and Supply of Alumino thermic welding portions as approved by RDSO for welding of rails and execution of AT welding's under sanctioned track renewal works (CTR/TRR, ISD, TTR etc.).
Construction of New Mechanized Laundry Phase II at Gorakhpur Coaching Depot of N.E. Railway
" Fabrication assembly in situ G-3/L type glued insulated joints for broad guage 60 Kg/52 Kg with all contractor's materials, to and form transportation of material,octrai etc. Complete as per instructions contained in manual for glued insulated rail joints in Shahjanwa-Maghar-Jagatbela-Bansgaon new line in connection with Shahjanwa-Doharighat new line project of Lucknow Division of N.E.Railway.
Design, Supply, Installation and Commissioning of paddy straw cutting and soaking tank/wagon
Facility Management Services - LumpSum Based - S/F of Changeover Switch and Cable Complete Work; S/F of Changeover Switch and Cable Complete Work; Consumables to be provided by buyer
Facility Management Services - LumpSum Based - Supply of Aluminium Two Core PV 6x4 Cable and Timer Connector complete work; Supply of Aluminium Two Core PV 6x4 Cable and Timer Connector complete work; Consumables to be provided by buyer
SOLAR OPERATED INFLATABLE SCARE CROW
Rexine for LHB AC-III tier economical coach in width-1270 mm as per specification No-RDSO/2008/CG-07, Rev-0, amndt. No-5, colour- PF Light grey.
Renewal of Chauri Sagda connecting road (LOT No 21 of 94)
Face Plate for Buffer Plunger for Coaching Stock etc.
Hemospot for Occult Blood Test.
Spring type PVC drain pipe with jaali threaded dia 45 mm. and their locking nut will be of SS, Make-Polo, Flexiwell, Kiwi or similar.
Dynamic Mechanical Analyzer
MISC
MISC
MISC
MISC
MISC
MISC
ROAD
B+Ve Surgical Face Mask , Pack of 50 Brand: B+Ve (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687754941584 dt.24/04/2026)
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; SAMUHIK VIVAH EVENT; Participation arrangements; Third-party premise; Full day
Construction of covered RCC drains in various wards of Nagar Panchayat Unwal.
In Ward No. 9 construction of a CC road and covered RCC drain from Mustafa house towards Vishen Kumar house
Construction of covered RCC drains in various streets in Ward No. 6.
Construction of covered RCC drains in various streets in Ward No. 8.
Construction of a covered RCC drain from Murali Verma boundary towards the main road in Ward No. 12.
In Ward No. 2 construction of a CC road and covered RCC drain from Chandrabhan Yadav house towards the main road
Construction of a covered RCC drain from Kali Mandir towards the bypass culvert in Ward No. 8.
In Ward No. 12, construction of a CC road from Jim In Ward No 12 construction of a CC road from Jim Akhtar garden via Dhanragi house towards Murali Verma house
In Ward No. 2 construction of a CC road from Sirajuddin house towards Poojan house
In Ward No 2/14 construction of a CC road from Asgar house towards the Shiv Temple
In Ward No 5/11 construction of a CC road from Bansgaon main road via Durgesh Vishwakarma house towards Mangru Sheikh boundary
In Ward No. 7, road widening and PC/painting work is underway from Mixal towards the culvert via Karmayogi School on the Bansgaon main road.
In Ward No. 9 construction of a CC road from the main road through Haridwar house towards Ayub Khan boundary
In Ward No. 4 Sikadiapura construction of a CC road and RCC drain in various streets from Bhagirathi Maurya house towards Raju Chauhan house from Ramswarth house towards Awadh Yadav house and in various lanes
In Ward No. 14 construction of a covered RCC drain from Amit Gupta house to Faizullah Ansari house
Construction of a covered RCC drain from Nisar Ansari shop towards Sharma Tent House in Ward No. 14
Construction of covered RCC drains in various streets in Ward No. 14
Work of HDPE pipeline extension and house connections in Ward No. 4, 5, 6, 11, 13.