Loading…
Loading…
6,249 results • Latest
In Ward No. 2 construction of a CC road and covered RCC drain from Chandrabhan Yadav house towards the main road
Construction of a covered RCC drain from Kali Mandir towards the bypass culvert in Ward No. 8.
In Ward No. 12, construction of a CC road from Jim In Ward No 12 construction of a CC road from Jim Akhtar garden via Dhanragi house towards Murali Verma house
In Ward No. 2 construction of a CC road from Sirajuddin house towards Poojan house
In Ward No 2/14 construction of a CC road from Asgar house towards the Shiv Temple
In Ward No 5/11 construction of a CC road from Bansgaon main road via Durgesh Vishwakarma house towards Mangru Sheikh boundary
In Ward No. 7, road widening and PC/painting work is underway from Mixal towards the culvert via Karmayogi School on the Bansgaon main road.
In Ward No. 9 construction of a CC road from the main road through Haridwar house towards Ayub Khan boundary
In Ward No. 4 Sikadiapura construction of a CC road and RCC drain in various streets from Bhagirathi Maurya house towards Raju Chauhan house from Ramswarth house towards Awadh Yadav house and in various lanes
In Ward No. 14 construction of a covered RCC drain from Amit Gupta house to Faizullah Ansari house
Construction of a covered RCC drain from Nisar Ansari shop towards Sharma Tent House in Ward No. 14
Construction of covered RCC drains in various streets in Ward No. 14
Work of HDPE pipeline extension and house connections in Ward No. 4, 5, 6, 11, 13.
Pipeline extension and installation of 1 tube well 20 HP in Ward No. 3.
Work of HDPE pipeline expansion and house connections in Ward Nos. 5, 9, 11, 03, 02, 01, 07, 08.
Beautification work of Maya Chaudhary pond in Ward No. 7/12.
Construction of covered RCC drains in various lanes of Ward No 7
Construction of covered RCC drains in Ward No 7 from Palihar house to Lalu field leading towards Goghara drain culvert.
HDPE pipeline extension and house connection work in Ward No. 7.
Work of HDPE pipeline expansion and house connections in various wards of Nagar Panchayat Unwal, and installation of one mini tubewell of 10 HP.
HDPE pipeline extension and house connection work in Wards No 4 6 11 12
Construction of a covered RCC drain from National School in Ward No. 12 passing by Ramkesh Gaur house, towards Ganga Sahni house
Construction of a covered RCC drain from Sagar Vishwakarma house to Tej Pratap house in Ward No. 7.
Construction work of CC road and covered RCC drain from Shashimoul Pandey house through Kripal Gupta house towards the front of Bhalu Hardware in Ward No. 5
Construction of covered RCC drains in various wards of Nagar Panchayat town Sangrampur alias Unwal.
Construction work of CC road and covered RCC drain from Kripal Gupta shop to Bhagwati Kevat house in Ward No4 towards the nala via Maurya Tola
Construction work of CC road from Ramakant Yadav house in Ward No. 4 towards the nala via Maurya Tola
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Metallurgical Microscope (Q2) (3 (3 ))
Sampark marg gram-karmel, harijan basti se belkunda pandatola chauriyatola hote hue gram-parsotima me rambriksh chauhan tak nirman karya
High Pressure Banjo Elbow Scrapper Urea, Union elbow for Scrapper Urea 6 MM OD, Union for Scrapper Urea 6 MM OD, Male Stud Connector G1 4A Scrapper Urea, Male Stud Connector G1 8A Scrapper Urea, Fitting Non Return Valve Scrapper Urea
Sampark marg Gorakhpur-deoria marg se gauri khurd chauhan tola hute hue gauri buzurg me ramprit ke ghar tak nirman karya
WORK OF PRELIMINARY SURVEY OF TRANSMISSION LINES AND SUBSTATION FOR CONSTRUCTION OF PROPOSED 132 KV S/S BARHAJ, DEORIA UNDER ETD, DEORIA
Widening and Strengthening of Uruwa Dhudhara Pipri Road ODR KM 1 to 11 in Distt Gorakhpur With 05 Year Maintenance LOT NO-1 of 1
Widening and strengthening of Saraiya Basthan Road length 13.800 km in Gorakhpur district in the financial year 2025-26 including 5 years maintenance work) Lot No 1 of 1
Sampark marg gram-jogiya me pmgsy sampark marg se ramanand maurya ke tole tak nirman karya
Sampark marg deoria-kasia marg se konhwalia me mandir tak nirman karya
Sampark marg mathia me panchayat bhawan se shampur marg tak nirman karya
Ward number 60 Vikas Nagar EWS_LIG colony Mein pipe line badalne ka Karya
Sampark marg kubersthan pipra jatampur marg se nauka tola tak nirman karya
Work of extension of 410 meter 150 mm K7 pipeline from Charan Lal Chowk Janta Jewelers in Beniganj Rudrapur to Saraswati Shishu Mandir in front of Ishwar Pipe shop
Ward number 42 Maharana Pratap Nagar Mein Savera marriage house nalkup se Rasulpur Road Tak peyjal pipeline vistar ka Karya
Sampark marg Rudrapur narayanpur marg par pipra kachhar marg se vithalpur se bandh marg hote hue taharhuli buzurg, sonbarsa tak nirman
Sampark marg varwameer chhapar dubauli marg se maa kali mandir kuraini tak nirman karya
Supply, Installation and Commissioning of pneumatic Pipeline at One Washing pit of Coaching Depot TPU & KGM.
OHE Modification work at various Proposed ROB under Electrical Construction Unit Gorakhpur (At LC No. 115 Spl in Bhatni Yard, LC No. 67C in Padrauna, LC No. 4 in Indara)
Sampark marg tarkulwa anandnagar marg se brindawan me prabhu kharwar ke khet se nahar pul tak nirman karya
Fabricated Rubber Hose pipe (Length -36 inch, Inner Dia %u2013 100 mm, Outer Dia-114mm) to IS: 444/2025 Type-1.
Sampark marg gram sabha augustpar me bechu ke khet se mandir prangan tak nirman karya
Sampark marg tawwaqalpur se paschim mathia musahari marg tak nirman karya