Loading…
Loading…
5,885 results • Latest
Construction of Khajni Main Road Khanipur Chauraha to house of Pappu Pal via House of Ramashanker Singh Link Road - Length 1-35 km including 5-year maintenance- Lot No 3 of 19
Construction of Matiyara Tuble To bhaksa Chadrao West link road - Length 1-20 km including 5-year maintenance- Lot No 2 of 19
Construction of Primary School Darba to Alagatpur Puliya Link Road Length 1-00 km including 5-year maintenance- Lot No 1 of 19
Construction of Box culvert in 6x6 meter 03 cell at Mahudabar Gopalpur Padariya Sewai Link road in Block Piprauli District Gorakhpur Lot No 1 of 1
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Substation, Switchyard, Electrical System or Installation; Service Provider
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
For the Shifting work of 33 kv 11 kv and LT Lines from chhatra sangh chawk to ambedkar chawk via Hariom nagar Tiraha Distt Gorakhpur
IT HARDWARE
Hermitically Sealed Scroll Compressor, Suitable for R-407 C Refrigerant Gas
Block-Gagha Gram panchayat Akusi mein gate se Shiv Mandir Tak CC Road Ka Nirman
Block-Bansgaon Gram panchayt Dadi rawat mein Vijay Bahadur Singh ke Ghar se Doctor Sunil Singh ke khet Tak CC Road Ka Nirman
Gear Lubricants, Multipurpose (?Extreme?Pressure?Gear? Oil?) (V3) Conforming to IS 1118 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Rest Plate assembly to Escorts Part No. SK-508 for overhauling of AAR "H" type CBC in passenger coaches confirming to RDSO Spec. No. RDSO/2011/CG-03 (Rev.1).
LED Light fitting for Passenger Area (Cabin) for LHB AC Coaches, Type-L (18W) as per RCF Drg No. LW76090 Alt. B conforming to RDSO Spec. No. RDSO/PE/SPEC/TL/0091-2016 (Rev-1), RCF Annexure-1,2,3.
Hex. Head Bolt etc.
Glass unit for fixed window etc.
Construction of village Punraha to pakadihar to Thakurai mundera link road- Length 4-00 km including 5-year maintenance- Lot No 10 of 19
Construction of Mahuadabar Girls School to Rampur Maloli Link Road- Length 1-50 km including 5-year maintenance- Lot No 5 of 19
Construction work of Dubauli Tubel se Purab Parmatma Ojha ke Khet tak in the financial year 2026-27 Including 05 years maintenance repair Lot No 10 of 12
Construction work of Ramkola tola belma me malahpurwa se balua dala tak in the financial year 2026-27 Including 05 years maintenance repair Lot No 8 of 12
Construction work of karmani Khadkhadiya marg ke Foolmati girls school hote hue khajwa tak in the financial year 2026-27 Including 05 years maintenance repair Lot No 7 of 12
Construction work of Chota Parsauna se Bandhe tak in the financial year 2026-27 Including 05 years maintenance repair Lot No 6 of 12
Construction work of Pipra churamn se Bakhraiti tak road in the financial year 2026-27 Including 05 years maintenance repair Lot No 5 of 12
Construction work of Maniram Flyover ke Niche se Ramesh Pradhan ke ghar tak in the financial year 2026-27 Including 05 years maintenance repair Lot No 3 of 12
Construction work of Gram panchayat Kaithwaliya me Rail Under Pass to gram Naiyapar tola Karmaha gao in the financial year 2026-27 Including 05 years maintenance repair Lot No 2 of 12
Manpower Outsourcing Services - Fixed Remuneration - Admin; Data Entry Operator; Secondary School, Manpower Outsourcing Services - Fixed Remuneration - Non-IT Technical; Crane Operator; Secondary School, Manpower Outsourcing Services - Fixed Remuneration - Technician-I; Technician-I; Secondary School, Manpower Outsourcing Services - Fixed Remuneration - Others; Electrician; Secondary School, Manpower Outsourcing Services - Fixed Remuneration - Track Maintainer; Track Maintainer; Secondary School, Manpower Outsourcing Services - Fixed Remuneration - Admin; Helper; Middle School, Manpower Outsourcing Services - Fixed Remuneration - Admin; Administrative Operator or Office Assistant or Executive Assistant; Middle School
BAR, SQ, HOLLOW, 150X150 X4, MS SQUARE HOLLOW SECTION (SHS) 150 X150 X 4MM THK, MOC: IS 2062 E250, 80X80X 4, MS SQUARE HOLLOW SECTION (SHS) 80 X 80 X 4MM THK, CHANNEL, ISMC 75, MS STEEL, CHANNEL ISMC 75
Drinking Water Coolers (V4) ISIMarked To IS1475 (Q2)
Spare of Speed Probe Branch Cable for the Speed Probe Installed in the SGT-400
GTG 30M FLEXIBLE CONDUIT BLUE, FLLHC0530 Kopex Make Blue Colour Flexible Conduit, Model: FLLHC0530,, GTG 30M FLEXIBLE CONDUIT BLACK, FLHC0530
Facility Management Services - LumpSum Based - Supply and Installation of Video Conferencing Camera; Supply and Installation of Video Conferencing Camera; Consumables to be provided by service provider (inclusive in contract cost)
Overhauling and repairing of 33 KV VCB of different 33 KV feeder at Various 132 KV Sub station UNDER ETD-I GORAKHPUR.
Spare of MIL CONTROL VALVE
ZSS RM 2211-NITD-PL-22-FP-PCB JAYSHREE ZERO SPEED SWITCH ONLY PCB, MODEL: RM 2211-NITD-PL-22-FP-PCB,, ZSS SENSOR SS316 M30X1.5Px65L JAYSHREE ZERO SPEED SWITCH SENSOR, MAKE: JAYSHREE, ENCLOSURE: SS316, S
data wall display (Q2) (3 (3 ))
Construction work of Vikas Khand Gola me Pokhari Goan Dubey Tola CC Road to Umashankar Dubey House hote hue Kahar Tola hote hue Dalit Basti Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 20 of 20
Construction work of Chilwa Harijan Basti to Gaderi Tola Dakwarchak Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 19 of 20
Construction work of Vikas Khand Gola me PWD Road to Jugesara Goan Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 17 of 20
Construction work of Rukunpur to Mohanapur Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 15 of 20
Construction work of Navli Pitch to Kaushal Mishra Tola hote hue Ram Samaj Pandey Tola to Pani ki Tanki Pitch tak Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 18 of 20
Construction work of CC road and drain from the house of Janardan Dutt Tiwari in Ward 07 Nandanagar Mo. Dargahiya to the house of Navrangi Chauhan, Pramod Rai MK Mishra via the house of Uma Devi, Dhruv Narayan Pandey
Ward 07 Nandanagar, construction work of CC road and drain from Shamsher Gate Road to Hemant Singh house and from Ashok Yadav to the boundary wall of Air Force and in branch streets
In Honorable Kashiram Awas Yojana in Ward No. 19 Gopalpur Mohalla Ramgarh, there is CC road from Deoria Bypass Road to Gaushala and drainage in various streets and construction of RCC drain
Road improvement in Gautam Vihar Vistar Colony and painting and repair work in the park
Road improvement and drain repair work in Buddha Bihar Part C.
REPLACEMENT OF MULSIFIRE SYSTEM PIPE LINE AT 220KV SUBSTATION GOLA, GORAKHPUR UNDER ETD-II GORAKHPUR.
Construction work of Narayanpur Bujurg to Narayanpur Khurd Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 14 of 20
Construction work of Baranagar Kalika Sthan to Baranagar pitch and Taryapar Dalit Basti to Kalika Mandir Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 13 of 20
Construction work of Rakhat Gadhi Beladar Baupar Rawatpar Road ODR KM 4 to Srirampur Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 12 of 20