Loading…
Loading…
2,946 results • Latest
Chart Sheet work sheet single pages, Scale Steel 3 ft, Magnifying Glasses with light, Plain Paper Roll 36 Inch, Repro MFP printer Cartridge RM 8107C 8107M 8107Y 8107BK 8107MBK Plotter rinter 8120 ink set
Flex Board, Flex Board Backlight, LED Strips, Metal Frame, Angle
156PM91196 PR CUT OFF VALVE, 156PH93645 HOSE, 156PM91252 MODE SELECTION VALVE, 155BH11349 SPACER 1 pt 0 MM, 155BH51817 BUSHING, 762HS03279 LEVEL INDICATOR, 376TM91003 OIL SEAL, 376TM91214 OIL SEAL, 376TM91263 OIL SEAL, 376TM91603 OIL SEAL, 376AX91226 OIL SEAL, 376AX91267 OIL SEAL, 375LL11032 BUSHING, 790EI02026 AIR CLEANER ASSY, 790EI02034 PRE CLEANER, CFS0131280 SCREW, CFB2520825 BOLT, 799PH98395 HOSE ASSY L 500 M22, 782BH11121 SPACER T 1, 782BS31023 CUTTER LH, 790BH11147 PLATE, 375HC91102 DUST SEAL, 799PH95673 HOSE ASSY, 799HSB0046 SEAL KIT K 53
Industrial Tray Dryer (GAIL) (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7114260 Dated : 15-01-2026 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No