Loading…
Loading…
151 results • Latest
Engineering procurement and Construction (EPC) of Important Bridge No. 136 (9x45.70m OWG), 151 (26x30.50m Ballasted Deck OWG Welded Through Type), 153 (11X30.50m Ballasted Deck OWG Welded Through Type+1X12.20m PSC Slab), 154 (14X30.50m Ballasted Deck OWG Welded Through Type), 161 (1X9.15m PSC Slab +10X30.50m Ballasted Deck OWG Welded Through Type +1X9.15m PSC Slab),162 (1X9.15m PSC Slab + 10X30.50m Ballasted Deck OWG Welded Through Type +1X9.15m PSC Slab), 163 (17X30.50m Ballasted Deck OWG Welded Through Type+1X12.20m PSC Slab ) & Major Bridge No.144 (2X12.20m PSC Slab), 145 (2X12.20m PSC Slab), 152 (4X45.70m OWG), 155 (2X9.15m PSC Slab), 156 (1X9.15m PSC Slab +1X30.5m Ballasted Deck OWG Welded Through Type +1X9.15m PSC Slab), 157 (2X45.70m OWG), 158 (1x9.15m PSC Slab +3x30.50m Ballasted Deck OWG Welded Through Type + 1X9.15m PSC Slab), 159 (1X9.15m PSC Slab +3X30.50m Ballasted Deck OWG Welded Through Type +1X9.15m PSC Slab ), 160 (7X30.50m Ballasted Deck OWG Welded Through Type) for 3rd & 4th line including their formation at approaches and protection works in connection with Punarakh - Kiul 3rd & 4th rail line Project
1-12 Canted Turnout R555 60kg GR-1080 RH and LH (including switch, lead & crossing assembly, check rail and rails for welded leg) as per specification No. EDFC-1 Annexure-B and Master drawing no. EDFCC4743-04 including all fitting & fastening, backdrive but excluding PSC sleeper, Signaling equipment.
Rail 60 Kg 90 UTS Grade 880, IRS-T-12-2009
Seelction of Implementation Agency for Diagnostics led Himachal Youth Cluster Agri-Enterprise Incubation Programme (HY-CAEIP)
Empanelment of agencies for the FPO Strengthening and Market Integration
Set of Cable Cleat with DIN Rail for TM Type 6 FRA 6068 for WAG-9/WAP-7 Locos to CLW SPEC.No.-CLW/ES/3/0045 (Alt.-G) (Ref.No.1 to 8) As Per Quantity.