Loading…
Loading…
92 results • Latest
Consultancy Services for DPR preparation for 2L PS from Km 66.00 to Km 119.00 (Hazaribagh- Chatra section) of NH-522(NH-100) in the State of Jharkhand.
Finalization/Analysis of rates of 400 kV Voltage Level HTLS Conductor equivalents to ACSR Twin Moose Conductor to be implemented for 3 Phase S/C transmission line (155 RKM approx.)
Household Refrigerating Appliances as per IS 17550 (Q2), Television (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Real Time PCR Machine (V2) (Q2)
Custom Bid for Services - As per NIT Similar Category Paper-based Printing Services
Construction of Double Story RCC Building at Pagar as Integrated Dining, Office, and Multipurpose Facility for CBCMP
MS DAC3GG TRONICS MSDAC G39, AXLE DETECTR 2 TX COILGG TRONICS AXL, AXLE DETECTOR RXCOILGG TRONICS, AV ALARM UNIT FLED BASED SIGNAL 110V, AV ALARM UNIT FLED BASED SIGNAL110V
Vibrometer-Induced Ground Vibration Monitoring Instrument (Q3)
Construction of PIT office and associated infrastructures facilities for KDCMP
Supply and Installation of Coal Lab Equipment at Coal Analysis Laboratory, CBCMPNML