Loading…
Loading…
6,690 results • Latest
Semi Automatic Washing Machine 3 Star 7.5 KG
AMC (year 2026-27) of North Saraswati River from Ch.22050.0 m (U/s of Jarura Bridge) to Ch.20250.0 m (D/S of Chandannagar Flyover) within Chandannagar Municipal Corporation, Dist. Hooghly
Construction of Cement Concrete Road from Gahami Champra Pukur to Gangur River within Jamna Gram Panchayat Under Pandua Panchaya Samity Under Pathashree-IV Fund.
From Kota Bajar to Palpukur via Bilpukur under Goghat I Block
Construction of cover slab on drain from Roy Builders to the house of Kailash Hela at Narua Panchanantala Booth no 14 in ward no 08 under CMC APAS
Renovation of Community Hall at Subhaspally Uttarpara Booth No 5 Ward No 33 under CMC APAS
AMC (year 2026-27) of North Saraswati River from Ch.25800.0 m (D/S of Swetpur NH Bridge) to Ch.24210.0 m (U/s of Bilkuli Bridge) within Chandannagar Municipal Corporation, Dist. Hooghly.
Construction of fencing at the east and west side of Subhaspally School ground and renovation of school ground using soil Booth No 6 Ward No 33 under CMC APAS
Annaul clearing and removing of water hyacinth including debris of Ghungir Khal for a length of 3.50 Km from Bhadreswar Rail Line to U/s of Syphon in Bhadreswar Municipality,PSBhadreswa Dist- Hooghly under CISD
Construction of kitchen of ICDS Centre at Shitalatala Abinash Ch. School Booth No 62 Ward No 32 under CMC APAS
Beautification of Durga Baroyari Ground at Paschimpara Subhaspally Booth No 7 Ward No 33 under CMC APAS
Annaul clearing AN removing of water hyacinth including debris of Ghungir Khal for a length of 4.00 Km from D/s of Syphon to Outfall at Baidyabati Khal in Baidyabati Municipality,PSSerampore, Dist- Hooghly under CISD
Renovation of Drain and increase of its depth from the house of Shampa Pal to the House of Mithu sen at Akunjibagan 3rd Lane Booth no 11 in ward no 08 under CMC APAS
Construction of drain and road from the ho Md Firjur to the ho Anjum Bibi at Bilkuli Natunpara booth no 69 in ward no 30 under CMC APAS
Construction of drain beside the ho Raja Roy at Purashree area booth no 60 in ward no 32 under CMC APAS
Construction of concrete road from Suchandras house to Abasan at Ashokepally booth no 61 in ward no 32 under CMC APAS
Construction of Pucca Drain with Slab From House of Jamal to Rail Line Dhar Via House of Sabur at Sansad 5 (114245613)
Construction of a concrete road from Balarambati Shibtala Chakraborty para Kajal patras house to the Balarambati Indubala primary school L 300 mirs W 10 ft 100 mtrs pilling and 200 mtrs gaurd wall at Balarambati GP under Singur Block
Procurement of Split Air Conditioner 3 Star 1.5 Ton
Construction of Pucca Drain from vivekanandapally kali mandir to house of Sukumar Singha via Baganepara at Sansad no 11 (114252395)
Construction of Jalachattara at Kharsarai Paschimpara Sansad 6 (14653707)
Const of Cement Concrete road from Komra Main Pitch road to Primary School via Roy Para at Sultanpur X Sansad Under 15th C.F.C.
AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; copper conductor flexible cable as per ATC (150 Mtr); Consumables to be provided by service provider (inclusive in cont.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; XLPE insulated extruded PVC inner and FRLS outer sheathed galvanised steel round or strip armoured cables as per ATC (1.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; 63 Amp TPN MCB (1 Nos); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; ELCB with 100mA Sensitivity 63Amp 4Pole (1 Nos); Consumables to be provided by service provider (inclusive in contract .., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Excavating the trenches and refilling the same after the cable is laid in approved manner as per atc (60 Mtr); Consumab.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Supply and fixing 20 mm thick Marine Ply Plank (4 Nos); Consumables to be provided by service provider (inclusive in co.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Marine Ply service cupboard made from 20 mm thick Marine Ply planks as per atc (1 NOS); Consumables to be provided by s.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Procuring Power Connection in name of MCGM from concerned authority (1 NOS); Consumables to be provided by service prov.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; 3C x 4 Sqmm (55 Mtr); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; 50 x 50 x 6 mm of Ms angle (10 Mtr); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Flat bars 50 mm x 6 mm thick (10 Mtr); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; Providing and Fixing plastic kerb stones with LED Lighting System (15 NOS); Consumables to be provided by service provi.., Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; 16 or 32 Amp DP MCB (1 Nos); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; ELCB with 30 mA sensitivity 16 A 2 pole (1, Facility Management Services - LumpSum Based - SITC OF HIGHMAST AT DR BABASAHEB AMBEDKAR MAIDAN MALWANI MALAD WEST IN P WEST WARD; LED flexible strip light 2 wire min as per ATC (150 Nos); Consumables to be provided by service provider (inclusive in ..
2 Pole 32 Ampere
Camp Stools
RENOVATION OF CONCRETE ROAD FROM ANNA ROY TOWARDS THE HO RAMPRASAD BARIK AT CHOTOBELU
CONSTRUCTION OF DRAIN COVER FROM HO BISWANATH MONDAL TOWARD BABLU MONDAL SHOP AT PASCHIMPARA
CONSTRUCTION PACCA DRAIN FROM THE HO BABU MANNA TOWARDS THE HO SHIBU PAL AT PURBAPARA
CONSTRUCTION OF ROAD PROTECTION WALL FROM GP ROAD TOWARDS THE HO MUNMUN BHAWAN AT PASCHIMPARA
Construction of Jalachattara at Begampur Sitalatala (114657021)
CONSTRUCTION OF ROAD PROTECTION WALL FROM GP ROAD TOWARDS THE HO DUDHKUMAR BOR AT PASCHIMPARA
Construction of Jalachattara at Near Begampur Sibani Cinama (114652004)
CONSTRUCTION OF PACCA DRAIN FROM THE HO JAGANNATH KHAN TOWARDS THE HO PANCHU PATRA AT UTTAR RAJYADHARPUR
CONSTRUCTION OF PUCCA DRAIN FROM THE HO SUBHAS MODAK TOWARDS TALPUKUR AT BARABELU
Construction of Road from Begampur High School to Saishab School via Ghoshpara at Sansad No -15 (114214757)
Construction of PCC road from Begampur Paschimpara Kalimandir to Sil Bari via Bimal Dey via Late Bakereswar Das at sansad no 12 (114206586)
AMC for Maintenance of Railway Track of DCC from Take Off Point at Janai Road Station(JOX) to Janai Main Gate of DCC and from janai main gate to buffer point at central laboratory(LPDC)With Bush, grass cutting, tree trimming inside and outside plant
Procurement of Refrigerator 180 ltr
CONSTRUCTION OF CC DRAIN AT BENGAI PASCHIM GHOSH PARA BARGERE
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF PARESH GHOSH TO THE HOUSE OF NABIN GHOSH
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF PARESH GHOSH TO THE HOUSE OF NABIN GHOSH
Disconnecting And Earthing Device, 8 Pole 2 way, without Off, on load 125 A at 1000 V AC, 2 NO + 2NC Etc.
INSTALLATION OF 5 NOS STREET LIGHT AT BENGAI 31 NO. BOOTH (1. MANDA MANDIR 2 NOS, ADIBASIPARA- 2 NOS. SHITALA MANDIR-1 NOS)
CONSTRUCTION OF BOUNDARY WALL AT KEDARNATH PRY SCHOOL
Emergent repairing work at Cantonment Road from 0.00 kmp to 1.50 km. in patches under Hooghly Sub-Division_I, of Hooghly Division, PWD, during the year 2025_26 in the District of Hooghly
REPAIRING OF ROAD BY BRICK AND BATS FROM LAXMITALA TO ADIBASI PARA
Construction of concrete pavement, drain, repairing cover slab over drain at Gondalpara Tin Bazar Joty Das Goli upto the house of Uttam Chowdhury under Booth No 156 in Ward No 25 CMC
Construction of concrete pavement mill line 4 and 5 no starting from the house of Ganesh Chowdhury up to the house of Chotelal Chowdhury under Booth No 157 in ward no 25 CMC
Renovation of drain from the Patras house to Dutta Jewellers at Barasat Jelepara at Booth no 151 in ward no 21 under CMC APAS